Download Print this page

PROKORD DUSBKF1-84 User Manual page 5

Advertisement

Figure C
3.Remove the standard wall-mounted cross beam from the packing box, assemble
the M8*70 hexagonal bolt and M8 nut with hexagonal wrench and cushion pad in
turn on the left and right columns of the mobile support (upper and lower
positions should be adjusted according to personal needs), and the operation
schematic diagram is as shown in Figure D, rotate the M5*100 screw on the wall-
mounted vertical beam to the position show in the local graph a, and then
assemble the wall-mounted vertical beam and the machine with a screwdriver.
Draw a schematic diagram as shown in Figure E. Finally, hang the machine with
the vertical beam on the wall-mounted cross beam (refer to the assembly drawing
of the wall-mounted bracket), then lock the M5*100 screw to the top of the wall-
mounted cross beam with a long screwdriver. The operation schematic diagram is
as follows: the assembly drawing of the wall-mounted bracket and the local graph
B.
Figure D
3

Advertisement

loading