Download Print this page

PROKORD DUSBKF1-84 User Manual page 4

Advertisement

Mobile bracket assembly and installation steps:
1. Remove the base from the packing box. Firstly, assemble the casters to the corresponding
position of the base with M6*16 bolts combined with cross screwdriver and cross hexagonal
head. The operation schematic diagram is shown in Figure A.
Cross hexagonal head corbination 16 bolt
(Quantity: 16PCS)
Figure A
2. Remove the left and right column of the movable support in turn from the packing box,
insert the welded M14*70 bolt on the column into the corresponding assembly hole of the
base in the direction (pay attention to the M6 thread on the side of the column in the inner
side). Put M14 cushion and M14 cushion on the welded M14*70 bolt on the column in turn,
and then fasten it with M14 hexagonal nut, as show in Figure B. Remove the layer board
from the packing box and use M6*1610. The laminate is assembled between the left and
right columns by the combination screw of the head of the word plate. The operation
schematic is show in Figure C. Attention direction.
Figure B
2.5 inch univorsal caster belt brake
(Quntity: 2PS)
2

Advertisement

loading