Mounting; Putting Into Operation - Busch-Jaeger 8186/03 Operating Instructions Manual

Patch panel poe
Table of Contents

Advertisement

Available languages

Available languages

Putting into Operation

Mounting

Attention: Work on the
power supply may only
be carried out by
authorized electricians!
Danger for life! Discon-
nect the main voltage
at first for all mounting
works.
Pay attention to the actual
norms, in order to fulfil the
general safety requirements for
telecommunication systems
and to avoid disturbing inter-
ferences.
Pay attention to the shock-
proof protection of the heavy-
current part in combined
plants. The shock-proof pro-
tection must also be guaran-
teed, when you have removed
the common covering (this is
not always given for old instal-
lations).
12
Take care that the minimum
distance of 10 mm between
data-/telecommunication
cables and heavy-current
cables are strictly observed
during the erection of com-
bined plants.
Working in existing data net-
works requires – if necessary
– the assent of the respective
person in charge of network
and data as well as a prece-
ding data security.
Please also observe the per-
mitted operating temperature,
do not place the Patch Panel
PoE and the Power Supp-
ly PoE directly beside devices
with high heat evolution (e.g.
dimmer).
Attention:
This Power Supply PoE is
intended only for an upright
mounting!
The mounting is carried out as
follows:
1
Snap the Patch Panel PoE
on the DIN rail.
2
Disconnect the screws
from the device's lid and
remove the lid.
3
After installation put the lid
on and screw it on.

Advertisement

Table of Contents
loading

This manual is also suitable for:

8186/04

Table of Contents