Ceragon FibeAir 1500HP Installation Manual
Ceragon FibeAir 1500HP Installation Manual

Ceragon FibeAir 1500HP Installation Manual

Hide thumbs Also See for FibeAir 1500HP:
Table of Contents

Advertisement

FibeAir
1500HP/RFU-HP
®
Installation Guide
Part ID: BM-0111-0
Doc ID: DOC-00015514 Rev C
March 2015
Copyright © 2015 by Ceragon Networks Ltd. All rights reserved.

Advertisement

Table of Contents
loading

Summary of Contents for Ceragon FibeAir 1500HP

  • Page 1 FibeAir 1500HP/RFU-HP ® Installation Guide Part ID: BM-0111-0 Doc ID: DOC-00015514 Rev C March 2015 Copyright © 2015 by Ceragon Networks Ltd. All rights reserved.
  • Page 2 Installation Guide Notice This document contains information that is proprietary to Ceragon Networks Ltd. No part of this publication may be reproduced, modified, or distributed without prior written authorization of Ceragon Networks Ltd. This document is provided as is, without warranty of any kind.
  • Page 3: Table Of Contents

    4. Related Documents ..................7 5. Important Notes ....................8 6. 1500HP/RFU-HP Models and Part Numbers ........... 9 7. FibeAir 1500HP/RFU-HP OCBs ..............11 7.1.1 OCB Components ......................12 8. Split-Mount Installation with the OCB ............13 Required Tools for the OCB Installation ..............13 Special Tools/Materials ....................
  • Page 4 21.2.1 Parts Used ......................... 161 21.2.2 Assembly ........................161 21.3 1+1 HSB (Hot Standby) Installation ................164 21.3.1 Parts Used ......................... 164 21.3.2 Assembly ........................164 22. Appendix A: Electrical Diagrams..............167 Ceragon Proprietary and Confidential Page 4 of 167...
  • Page 5 är kopplad till kabel-TV nät kan i vissa fall medfőra risk főr brand. Főr att undvika detta skall vid anslutning av utrustningen till kabel-TV nät galvanisk isolator finnas mellan utrustningen och kabel-TV nätet. Ceragon Proprietary and Confidential Page 5 of 167...
  • Page 6 Gefahrenrisiko: Durch Abtrennen einer Stromquelle wird nur ein Stromversorgungsmodul abgetrennt. Um die Einheit vollständig zu isolieren, trennen Sie alle Stromversorgungen ab. Maschinenlärminformations-Verordnung - 3. GPSGV, der höchste Schalldruckpegel beträgt 70 dB(A) oder weniger gemäß EN ISO 7779. Ceragon Proprietary and Confidential Page 6 of 167...
  • Page 7: About This Guide

    For the warranty to be honored, install the unit in accordance with the instructions in this manual. Target Audience This guide contains technical information about 1500HP/RFU-HP installation, and is intended for use by qualified Ceragon technical personnel at all levels. Related Documents  FibeAir IP-20N Installation Guide – DOC-00040492 ...
  • Page 8: Important Notes

    (Type 2 or Type 4 port as described in GR-1089-CORE, Issue 4) and require isolation from the exposed OSP cabling. The addition of Primary Protectors is not sufficient protection in order to connect these interfaces metallically to OSP wiring. Ceragon Proprietary and Confidential Page 8 of 167...
  • Page 9: 0Hp/Rfu-Hp Models And Part Numbers

    1500HP 1RX Models – All Indoor 15HPA-1R-RFU-7 1500HP 7G 1RX All Indoor 15HPA-1R-RFU-8 1500HP 8G 1RX All Indoor 15HPA-1R-RFU-6L 1500HP 6LG 1RX All Indoor 15HPA-1R-RFU-6H 1500HP 6HG 1RX All Indoor 15HPA-1R-RFU-11 1500HP 11G 1RX All Indoor Ceragon Proprietary and Confidential Page 9 of 167...
  • Page 10 RFU-HP 6LG 1Rx up to 56M SM / All Indoor RFU-HP-1R-7 RFU-HP 7G 1Rx up to 56M SM / All Indoor RFU-HP-1R-8 RFU-HP 8G 1Rx up to 56M SM / All Indoor Ceragon Proprietary and Confidential Page 10 of 167...
  • Page 11: Fibeair 1500Hp/Rfu-Hp Ocbs

    FibeAir® 1500HP/RFU-HP Installation Guide FibeAir 1500HP/RFU-HP OCBs FibeAir 1500HP/RFU-HP supports two types of OCBs:  Old OCB  Both OCBs are compatible with all RFU-HP/1500HP part numbers. Old OCB This installation guide describes installations using the newer type OCB. For installation procedures using the older type OCB, refer to Revision B and older versions of this Installation Guide.
  • Page 12: Ocb Components

    N+1 /N+ 0 configurations.  Pole Mount Kit – The Pole Mount Kit can fasten up to five OCBs and the RFUs to the pole. The kit enables fast and easy installation. Ceragon Proprietary and Confidential Page 12 of 167...
  • Page 13: Split-Mount Installation With The Ocb

    Torque Table; make sure you apply appropriate torque every time. Tightening Torques Thread Size Tightening Torque (Nm) 8-32 UNC 2.0 ± 0.2 10-32 UNF 3.0 ± 0.3 M8x1.25 16 ± 1.0 M10x1.5 25 ± 1.1 Ceragon Proprietary and Confidential Page 13 of 167...
  • Page 14: Pole Mount Preliminary Assembly

    (1) and two washers (2) (do not tighten) (Step I in illustration below). 2 Arrange the OCBs (5) in a straight line and place the hanging profile (4) (Step II). Ceragon Proprietary and Confidential Page 14 of 167...
  • Page 15: Installing Couplers

    1 Place sealing gaskets (supplied in coupler kit) in the coupler flange grooves. 2 Connect the coupler with the gaskets to the relevant ports. 3 Tighten the built-in screws to the OCB. Ceragon Proprietary and Confidential Page 15 of 167...
  • Page 16: Installing S-Bends And The Dcb

    1 Place the sealing gaskets (supplied with the S-Bend/DCB kit) in the flange grooves. 2 Connect the S-Bend/DCB with the gaskets to the relevant ports. 3 Tighten the built-in screws to the OCB. Ceragon Proprietary and Confidential Page 16 of 167...
  • Page 17: Short Installation

    FibeAir® 1500HP/RFU-HP Installation Guide Short Installation 1 Install the short plate using the flange gasket, screws, and washers supplied with the short kit as shown below. Ceragon Proprietary and Confidential Page 17 of 167...
  • Page 18: Termination Installation

    FibeAir® 1500HP/RFU-HP Installation Guide Termination Installation 1 Install the termination using the flange gasket, screws and washers supplied with the termination kit as shown below Ceragon Proprietary and Confidential Page 18 of 167...
  • Page 19: Short With Tapped Holes Installation

    FibeAir® 1500HP/RFU-HP Installation Guide Short with Tapped Holes Installation 1 Install the short plate with tapped holes using the gasket supplied with the DCB kit and DCB captive screws as shown below. Ceragon Proprietary and Confidential Page 19 of 167...
  • Page 20: Final Branching Installation

    The quantities are for one Washer, Helical spring lock, SS, OCB and may change in DIN 7980-8.1-A2-70 accordance with the installed configuration Couplers (up to five OCBs) Lifting Collar Eye Bolt M8-1.25 steel, Zink plated Ceragon Proprietary and Confidential Page 20 of 167...
  • Page 21: Connecting The Rfu To The Ocb

    12Nm. Description Quantity Remarks OCB Assy. The quantities are for one RFU and may change in accordance with the installed configuration (up to five RFUs) Screw (part of RFU Assy) 2 Ceragon Proprietary and Confidential Page 21 of 167...
  • Page 22: Housing Assembly And Lifting Harness

    Before lifting, make sure all OCB units are properly tied to the lifting harness. 4 Carefully lift the assembly for Pole Installation. Description Quantity Pillar Housing Hanging Profile Screw, Phillips Pan head, SS, ANSI, #8- 32UNCx1/2" Washer, Helical spring lock, SS, ANSI, #8 Ceragon Proprietary and Confidential Page 22 of 167...
  • Page 23: Pole Installation

    Hanging Profile (6) to the Pole (7). Description Quantity Nut, Hex, SS, DIN 934-M10-A2-70 Washer, Helical spring lock SS, DIN 127-B10-A2-70 Pillar Clamp Hanging Profile Screw, Hex cap, SS, DIN 933-M10x200-A2-70 Ceragon Proprietary and Confidential Page 23 of 167...
  • Page 24: Hanging Positions

    FibeAir® 1500HP/RFU-HP Installation Guide Hanging Positions You can pole mount the Hanging Profile on any of the four available positions, as shown in the following illustration. Ceragon Proprietary and Confidential Page 24 of 167...
  • Page 25: Outdoor Branching Network (Obm) Housing Hanging Procedure

    The quantities are for one Washer, Helical spring lock, SS, DIN RFU and may be changed in 7980-8.1-A2-70 accordance with the installed OBN OCB Housing configuration (up to five RFUs) Hanging Profile 4 RFU’s Ceragon Proprietary and Confidential Page 25 of 167...
  • Page 26: Connecting A Flexible Waveguide

    FibeAir® 1500HP/RFU-HP Installation Guide Connecting a Flexible Waveguide 1 Connect the Flexible Waveguide using the flange gasket, screws, and washers supplied with the Flexible Waveguide kit as shown below. Ceragon Proprietary and Confidential Page 26 of 167...
  • Page 27: Rfu Cable Connections

    FibeAir® 1500HP/RFU-HP Installation Guide RFU Cable Connections The RFU cable connectors are located on the bottom of the RFU, as shown in the following photo: IF Cable Source Sharing / Ceragon Proprietary and Confidential Page 27 of 167...
  • Page 28 XPIC/RSL – For XPIC functionality and radio signal monitoring.  IF – Connects the RFU to the IDU.  Ground – Used for electrical ground.  Flexible Waveguide – Connects the RFU to the antenna. Ceragon Proprietary and Confidential Page 28 of 167...
  • Page 29: Grounding The 1500Hp/Rfu-Hp

    FibeAir’s battery return terminals are in the configuration of an Isolated DC return (DC-I) and Common DC Return (DC-C). The grounding point is assembled as shown in the following illustration. Single point stud Tooth Washer Terminal Ceragon Proprietary and Confidential Page 29 of 167...
  • Page 30: Installation Instructions For Specific Configurations

    FibeAir® 1500HP/RFU-HP Installation Guide Installation Instructions for Specific Configurations This chapter provides detailed instructions for specific FibeAir 1500HP/RFU- HP configurations. Note that in this chapter, the following abbreviations are used:  HSB - Hot Standby  FD - Frequency Diversity ...
  • Page 31 2 Mount the OCB to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 31 of 167...
  • Page 32 5 Mount the flexible waveguide and O-ring to the main (upper) port using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 32 of 167...
  • Page 33: 1+0 Sd

    2 Mount the OCB to the OCB pole mount, as described in as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 33 of 167...
  • Page 34 5 Mount both the flexible waveguide and the O-ring to the MAIN port and the DIV port using the screws and washers supplied in the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 34 of 167...
  • Page 35: 1+1 Sd

    OCB Pole mount kit OCB-Pole Mount 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc OCB Coupler f GHz OCB-CPLR-f Procedure 1 Mount the termination on the rear side, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 35 of 167...
  • Page 36 2 Mount the OCB to the OCB pole mount, as described in as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 36 of 167...
  • Page 37 FibeAir® 1500HP/RFU-HP Installation Guide 4 Attach a coupler to the Main OCB Waveguides and secure it with screws. 5 Attach a coupler to the Div OCB Waveguides and secure it with screws. Ceragon Proprietary and Confidential Page 37 of 167...
  • Page 38 FibeAir® 1500HP/RFU-HP Installation Guide 6 Attach the pole mount bracket to the pole, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 38 of 167...
  • Page 39: 1+1 Hsb

    15HP-TERM-ccc OCB Coupler f GHz OCB-CPLR-f Procedure 1 Mount the termination and short flange on the rear side, as described in Short Installation on page 17 and Termination Installation on page 18. Ceragon Proprietary and Confidential Page 39 of 167...
  • Page 40 2 Mount the OCB to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 40 of 167...
  • Page 41 Installation Guide 4 Attach a coupler to the OCBs and secure it with screws. 5 Attach the pole mount bracket to the pole, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 41 of 167...
  • Page 42: 2+0 Dp

    2 Mount the OCB to the pole mount, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 42 of 167...
  • Page 43 5 Mount the flexible waveguide and O-ring to the MAIN (upper) port using the screws and washers supplied in the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 43 of 167...
  • Page 44 FibeAir® 1500HP/RFU-HP Installation Guide 6 Repeat the procedure for the second polarization. Ceragon Proprietary and Confidential Page 44 of 167...
  • Page 45: 2+0 Sp

    1 Mount the OCBs to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. 2 Slide and tighten both radios to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 45 of 167...
  • Page 46 4 Mount the S-Bend between the OCBs, as shown below and as described in Installing S-Bends and the DCB on page 16. 5 Attach the OCB pole mount bracket to the pole, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 46 of 167...
  • Page 47 6 Mount the flexible waveguide and O-ring to the MAIN (upper) port using the screws and washers supplied in the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 47 of 167...
  • Page 48: 2+0 Sd Sp

    1 Mount the OCBs to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. 2 Slide and tighten both radios to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 48 of 167...
  • Page 49 3 On the rear side, mount the termination flange, as shown below and as described in Termination Installation on page 18. 4 Mount the S-Bend and DCB to the OCBs, as shown below and as described in Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 49 of 167...
  • Page 50 7 Mount the flexible waveguide and O-ring to the MAIN (upper) port using the screws and washers supplied in the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 50 of 167...
  • Page 51: 2+0 Sd Dp

    2 Mount the OCB to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 51 of 167...
  • Page 52 5 Mount the flexible waveguide and O-ring to the MAIN (upper) port using the screws and washers supplied in the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 52 of 167...
  • Page 53 FibeAir® 1500HP/RFU-HP Installation Guide 6 Repeat the procedure for the second polarization. Ceragon Proprietary and Confidential Page 53 of 167...
  • Page 54: 2+2 Sd Sp

    3 On the rear side, mount termination plates to the RX ports of the second and fourth radios using the screws and washers supplied in the termination kit, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 54 of 167...
  • Page 55 FibeAir® 1500HP/RFU-HP Installation Guide 4 Mount the four radios to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 55 of 167...
  • Page 56 MAIN port of radio 2, and the second S-Bend between the EXT port of radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 56 of 167...
  • Page 57 6 Mount two DCBs; the first DCB between the DIV ports of radio 1 and radio 2, and the second between the DIV ports of radio 3 and radio 4. See Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 57 of 167...
  • Page 58 Installation Guide 7 Mount two couplers, one to the MAIN port of radio 1 and the other to the left port of the left DCB, as described in Installing Couplers on page 15. Ceragon Proprietary and Confidential Page 58 of 167...
  • Page 59 FibeAir® 1500HP/RFU-HP Installation Guide 8 Mount two terminations to the right ports of both DCBs using the screws and washers supplied with the termination kit, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 59 of 167...
  • Page 60 9 Mount a flexible waveguide with O-ring between the MAIN port in radio 3 and the Coupler port on the top coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 60 of 167...
  • Page 61 10 Mount a flexible waveguide with O-ring between the left port in the right DCB and the Coupler port on the bottom coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 61 of 167...
  • Page 62 11 Mount a flexible waveguide with O-ring between the main antenna and the Antenna port on the top coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 62 of 167...
  • Page 63 FibeAir® 1500HP/RFU-HP Installation Guide 12 If the diversity antenna is connected with a coax cable, connect a waveguide to coax adapter on the diversity coupler and connect the coax to the diversity antenna. Ceragon Proprietary and Confidential Page 63 of 167...
  • Page 64 FibeAir® 1500HP/RFU-HP Installation Guide If a waveguide connection is to be used, connect a waveguide directly to the Coupler port and the diversity antenna. Ceragon Proprietary and Confidential Page 64 of 167...
  • Page 65: 2+2 Sd Dp (Non-Upgradable)

    OCB Pole mount kit OCB-Pole Mount 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc OCB Coupler f GHz OCB-CPLR-f Procedure 1 Mount the terminations on the rear side, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 65 of 167...
  • Page 66 2 Mount the OCB to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radio to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 66 of 167...
  • Page 67 4 Attach a coupler to the left two main OCB waveguides and secure it with screws. 5 Attach a coupler to the left two Div OCB waveguides and secure it with screws. Ceragon Proprietary and Confidential Page 67 of 167...
  • Page 68 6 Attach a coupler to the right two main OCB waveguides and secure it with screws. 7 Attach a coupler to the right two Div OCB waveguides and secure it with screws. Ceragon Proprietary and Confidential Page 68 of 167...
  • Page 69 FibeAir® 1500HP/RFU-HP Installation Guide 8 Attach the pole mount bracket to the pole, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 69 of 167...
  • Page 70: 2+2 Hsb Dp (Ready For Upgrade)

    OCB Pole mount kit OCB-Pole Mount 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc OCB Coupler f GHz OCB-CPLR-f Procedure 1 Mount the terminations on the rear side, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 70 of 167...
  • Page 71 2 Mount two of the OCBs to the OCB pole mount bracket, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radios to the OCBs, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 71 of 167...
  • Page 72 Installation Guide 4 Attach a coupler to both radios and secure it with screws. 5 Attach the pole mount bracket to the pole, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 72 of 167...
  • Page 73 FibeAir® 1500HP/RFU-HP Installation Guide 6 Repeat steps 1 through 4. 7 Attach the pole mount bracket to the pole mount, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 73 of 167...
  • Page 74: 2+2 Hsb Dp (Non-Upgradable)

    OCB Pole mount kit OCB-Pole Mount 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc OCB Coupler f GHz OCB-CPLR-f Procedure 1 Mount the terminations on the rear side, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 74 of 167...
  • Page 75 2 Mount the OCB to the OCB pole mount bracket, as described in Pole Mount Preliminary Assembly on page 14. 3 Mount the radios to the OCBs, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 75 of 167...
  • Page 76 FibeAir® 1500HP/RFU-HP Installation Guide 4 Attach a coupler to both left radios and secure it with screws. 5 Attach a coupler to both right radios and secure it with screws. Ceragon Proprietary and Confidential Page 76 of 167...
  • Page 77 FibeAir® 1500HP/RFU-HP Installation Guide 6 Attach the pole mount bracket to the pole mount, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 77 of 167...
  • Page 78: 2+2 Hsb Sp

    4 On the rear side, mount shorts to the DIV ports of all four radios using the screws and washers supplied in the short kit, as described in Short Installation on page 17. Ceragon Proprietary and Confidential Page 78 of 167...
  • Page 79 FibeAir® 1500HP/RFU-HP Installation Guide 5 Mount the four radios to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 79 of 167...
  • Page 80 MAIN port of radio 2, and the second S-Bend between the EXT port of radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 80 of 167...
  • Page 81 FibeAir® 1500HP/RFU-HP Installation Guide 7 Mount the coupler to the MAIN port of radio 1, as described in Installing Couplers on page 15. Ceragon Proprietary and Confidential Page 81 of 167...
  • Page 82 8 Mount a flexible waveguide with O-ring between the MAIN port in radio 3 and the Coupler port on the coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 82 of 167...
  • Page 83 9 Mount a flexible waveguide with O-ring between the antenna and the Antenna port on the coupler, using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 83 of 167...
  • Page 84: Upgrade Instructions

    Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT OCB-Pole Mount OCB-Pole Mount Procedure 1 Start with a 1+1 SD configuration. 2 On the rear side, disassemble the termination from the EXT port on radio 1. Ceragon Proprietary and Confidential Page 84 of 167...
  • Page 85 4 On the rear side of the new radios, mount the termination to the EXT port of the fourth radio using the screws and washers supplied in the termination kit, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 85 of 167...
  • Page 86 FibeAir® 1500HP/RFU-HP Installation Guide 5 Mount the two new radios to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 86 of 167...
  • Page 87 MAIN port of radio 2, and the second S-Bend between the EXT port of radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 87 of 167...
  • Page 88 7 Mount two DCBs; the first DCB between the DIV ports of radio 1 and radio 2, and the second between the DIV ports of radio 3 and radio 4. See Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 88 of 167...
  • Page 89 Installation Guide 8 Mount two couplers, one to the MAIN port of radio 1 and the other to the left port of the left DCB, as described in Installing Couplers on page 15. Ceragon Proprietary and Confidential Page 89 of 167...
  • Page 90 FibeAir® 1500HP/RFU-HP Installation Guide 9 Mount two terminations to the right ports of both DCBs using the screws and washers supplied with the termination kit, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 90 of 167...
  • Page 91 10 Mount a flexible waveguide with O-ring between the MAIN port in radio 3 and the Coupler port on the top coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 91 of 167...
  • Page 92 11 Mount a flexible waveguide with O-ring between the left port in the right DCB and the Coupler port on the bottom coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 92 of 167...
  • Page 93 12 Mount the flexible waveguide with O-ring between the main antenna and the Antenna port on the top coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 93 of 167...
  • Page 94 FibeAir® 1500HP/RFU-HP Installation Guide 13 If the diversity antenna is connected with a coax cable, connect a waveguide to coax adapter on the diversity coupler and connect the coax to the diversity antenna. Ceragon Proprietary and Confidential Page 94 of 167...
  • Page 95 FibeAir® 1500HP/RFU-HP Installation Guide If a waveguide connection is to be used, connect a waveguide directly to the coupler port and the diversity antenna. Ceragon Proprietary and Confidential Page 95 of 167...
  • Page 96: Upgrading From 1+1 Hsb Sp To 2+2 Hsb Sp

    15HP Short for WRccc 15HP-SHORT-ccc Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT Procedure 1 Start with a 1+1 HSB configuration. 2 On the rear side, disassemble the termination from the EXT port on radio 1. Ceragon Proprietary and Confidential Page 96 of 167...
  • Page 97 5 On the rear side of the new radios, mount termination plates to the EXT port of the fourth radio using the screws and washers supplied in the termination kit, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 97 of 167...
  • Page 98 FibeAir® 1500HP/RFU-HP Installation Guide 6 Mount the two new radios to the OCB, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 98 of 167...
  • Page 99 MAIN port of radio 2, and the second S-Bend between the EXT port of radio 3 and the MAIN port of radio 4. See Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 99 of 167...
  • Page 100 FibeAir® 1500HP/RFU-HP Installation Guide 8 Mount the coupler to the MAIN port of radio 1, as described in Installing Couplers on page 15. Ceragon Proprietary and Confidential Page 100 of 167...
  • Page 101 9 Mount a flexible waveguide with O-ring between the MAIN port on radio 3 and the Coupler port on the coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 101 of 167...
  • Page 102 10 Mount a flexible waveguide with O-ring between the antenna and the Antenna port on the coupler, using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 102 of 167...
  • Page 103: Upgrading From 2+2 Dp To 3+3 Dp

    15OCBfx-xxxY-aa-L/H OCB Pole mount kit OCB-Pole Mount OCB-Sbend Kit OCB-SBend-f 15HP Short for WRccc Kit 15HP-SHORT-ccc Flexible WG Kit 3200T Flx WG xFT fGHz Procedure 1 Start with a 2+2 DP configuration. Ceragon Proprietary and Confidential Page 103 of 167...
  • Page 104 2 Disconnect the couplers and the terminations on the first and third OCB. 3 Mount the S-Bend to the OCBs, as shown below and as described in Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 104 of 167...
  • Page 105 6 Mount a flexible waveguide and O-ring to the MAIN (upper) port of the OCB and the Coupling port of the coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 105 of 167...
  • Page 106 Connecting a Flexible Waveguide on page 26. 8 On the second OCB pole mount, perform a mounting similar to a 1+1 HSB configuration, as described in 1+1 HSB on page 39. Ceragon Proprietary and Confidential Page 106 of 167...
  • Page 107: Upgrading From 2+2 Sd Sp To 3+3 Sd Sp

    15HP-SHORT-ccc OCB-Sbend Kit OCB-SBend-f DCB-UBend Kit DCB-UBend-f DCB Diversity Block fxGHz kit DCBfx ADPT WG/COAX CPR-ccc G-FLT WRccc ADPT G-FLT to N-TYPE kit F/N-TYPE KIT Flex. WG kit WR-ccc, 4 FT WAVEGUIDE-f-4FT Ceragon Proprietary and Confidential Page 107 of 167...
  • Page 108 Installation Guide Procedure 1 Start with a 2+2 SD SP configuration. WG #3 WG #1 WG #2 Coax to WG 2 Remove the coax to waveguide and all three flexible waveguides (both sides). Ceragon Proprietary and Confidential Page 108 of 167...
  • Page 109 Installation Guide 3 Remove the S-Bend, four terminations, and marked screws from the DCB. S-Bend 2 WG #2 Remove 6 screws WG #3 WG #1 WG #4 4 Remove the marked OCB. Ceragon Proprietary and Confidential Page 109 of 167...
  • Page 110 FibeAir® 1500HP/RFU-HP Installation Guide 5 Attach the S-Bend between the middle OCBs. 6 Mount a termination to the EXT port, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 110 of 167...
  • Page 111 7 Mount a short plate to the DCB, as described in Short Installation on page 17. 8 Mount three of the OCBs to the OCB pole mount, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 111 of 167...
  • Page 112 9 Mount the radios to the OCBs, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. 10 Attach two S-bend to both left OCBs, as described in Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 112 of 167...
  • Page 113 FibeAir® 1500HP/RFU-HP Installation Guide 11 Attach two DCBs to both right OCBs, as described in Installing S-Bends and the DCB on page 16. 12 Attach the U-Bend between the two DCBs. Ceragon Proprietary and Confidential Page 113 of 167...
  • Page 114 FibeAir® 1500HP/RFU-HP Installation Guide 13 Attach the two terminations, as described in Termination Installation on page 18. 14 Attach short on the DCB, as described in Short Installation on page 17. Ceragon Proprietary and Confidential Page 114 of 167...
  • Page 115 Pole Mount Preliminary Assembly on page 14. Already installed Upgrade addition 16 Attach flexible waveguide 1 from the Main port of the radio to coupler 1. Flexible WG #1 Coupler #1 Main Radio Ceragon Proprietary and Confidential Page 115 of 167...
  • Page 116 FibeAir® 1500HP/RFU-HP Installation Guide 17 Attach flexible waveguide 2 from the bottom DCB to coupler 2. Flexible WG #2 Coupler #2 Ceragon Proprietary and Confidential Page 116 of 167...
  • Page 117 Antenna port on the top coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Flexible WG to Main antenna Ceragon Proprietary and Confidential Page 117 of 167...
  • Page 118 Coax to WG to diversity antenna If a waveguide connection is to be used, connect a waveguide directly to the Coupler port and the diversity antenna. Ceragon Proprietary and Confidential Page 118 of 167...
  • Page 119: Upgrading From 2+2 Sd Dp To 3+3 Sd Dp

    OCB-Sbend Kit OCB-SBend-f 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc DCB Diversity Block fxGHz kit DCBfx Flexible WG Kit 3200T Flx WG xFT fGHz Procedure 1 Start with a 2+2 SD DP configuration. Ceragon Proprietary and Confidential Page 119 of 167...
  • Page 120 2 Disconnect the couplers and the terminations on the first and third OCB. 3 Mount S-Bends and DCBs to the OCBs, as shown below and as described in Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 120 of 167...
  • Page 121 5 Mount the coupler to the OCB, as shown below and as described in Installing Couplers on page 15. 6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 121 of 167...
  • Page 122 Connecting a Flexible Waveguide on page 26. 9 On the second OCB pole mount, perform a mounting similar to a 1+1 HSB SD configuration, as described in 1+1 HSB on page 39. Ceragon Proprietary and Confidential Page 122 of 167...
  • Page 123: Upgrading From 2+2 Hsb Sp To 3+3 Hsb Sp

    Marketing Model Quantity RFU-HP-1R-f or RFU 1Rx 15HPS-1R-RFU-f OCB with filters 15OCBfx-xxxY-aa-L/H OCB-Sbend OCB-SBend-f 15HP Short for WRccc 15HP-SHORT-ccc OCB-Pole Mount OCB-Pole Mount Procedure 1 Start with a 2+2 HSB SP configuration. Ceragon Proprietary and Confidential Page 123 of 167...
  • Page 124 4 Disconnect the terminations from the EXT port on radio 2 and radio 4. 5 Disassemble OCB 3 with radio 3 and OCB 4 with radio 4 from the old pole mount bracket. Ceragon Proprietary and Confidential Page 124 of 167...
  • Page 125 7 For the two radios on the rear side, mount a termination plate to the EXT ports using the screws and washers supplied in the termination kit, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 125 of 167...
  • Page 126 Short Installation on page 17. 9 Mount one new radio to each pole mount bracket, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 126 of 167...
  • Page 127 10 Mount two S-Bends in the top and bottom assemblies; between the EXT port of radio 2 and the MAIN port of radio 3, as described in Installing S- Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 127 of 167...
  • Page 128 11 Connect the loose side of the flexible waveguide with O-ring to the MAIN port on radio 1 in the bottom assembly, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 128 of 167...
  • Page 129 FibeAir® 1500HP/RFU-HP Installation Guide Ceragon Proprietary and Confidential Page 129 of 167...
  • Page 130: Upgrading From 3+3 Dp To 4+4 Dp

    RFU-HP-1R-f or RFU 1Rx 15HPS-1R-RFU-f OCB with filters 15OCBfx-xxxY-aa-L/H OCB-Sbend Kit OCB-SBend-f 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc 15HP Short for WRccc Kit 15HP-SHORT-ccc Flexible WG Kit 3200T Flx WG xFT fGHz Ceragon Proprietary and Confidential Page 130 of 167...
  • Page 131 FibeAir® 1500HP/RFU-HP Installation Guide Procedure 1 Start with a 3+3 DP configuration. 2 On the OCB pole with two OCBs, disconnect the coupler, add two OCBs, and slide in two radios. Ceragon Proprietary and Confidential Page 131 of 167...
  • Page 132 3 Mount the termination on the fourth OCB, as shown below and as described in Termination Installation on page 18. 4 Mount the S-Bend to the OCBs, as shown below and as described in Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 132 of 167...
  • Page 133 7 Mount a flexible waveguide and O-ring between the MAIN (upper) port of the OCB and the Coupling port of the coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 133 of 167...
  • Page 134 8 Mount a flexible waveguide and O-ring to the antenna port of the coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 134 of 167...
  • Page 135: Upgrading From 3+3 Sd Dp To 4+4 Sd Dp

    Quantity RFU 2Rx 15HP-RFU-f OCB 2Rx with filters 15OCBfx-xxxY-aa-L/H OCB-Sbend Kit OCB-SBend-f 1500HP WG Termination, WRccc Kit 15HP-TERM-ccc DCB Diversity Block fxGHz kit DCBfx Flexible WG Kit 3200T Flx WG xFT fGHz Ceragon Proprietary and Confidential Page 135 of 167...
  • Page 136 FibeAir® 1500HP/RFU-HP Installation Guide Procedure 1 Start with a 3+3 SD DP configuration. Ceragon Proprietary and Confidential Page 136 of 167...
  • Page 137 2 On the OCB pole with two OCBs, disconnect both couplers, add two OCBs, and slide in two radios as shown below. 3 Mount S-Bends and DCBs to the OCBs, as shown below and as described in Installing S-Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 137 of 167...
  • Page 138 5 Mount the coupler to the OCB, as shown below and as described in Installing Couplers on page 15. 6 Mount the OCB to the pole mount, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 138 of 167...
  • Page 139 8 Mount a flexible waveguide and O-ring to the antenna port of each coupler using the screws and washers supplied with the Flexible Waveguide kit, as described in Connecting a Flexible Waveguide on page 26. Ceragon Proprietary and Confidential Page 139 of 167...
  • Page 140: Upgrading From 3+3 Sd Sp To 4+4 Sd Sp

    Upgrading from 3+3 SD SP to 4+4 SD SP 19.9 List of Additional Items per Terminal Description Marketing Model Quantity RFU 2Rx 15HP-RFU-fx OCB 2Rx with filters 15OCBfx-SD-xxxY-aa-L/H OCB-Sbend OCB-SBend-f Procedure 1 Start with a 3+3 SD SP configuration. Ceragon Proprietary and Confidential Page 140 of 167...
  • Page 141 FibeAir® 1500HP/RFU-HP Installation Guide 2 Remove the two shorts from the DCBs. 3 Mount an OCB on each of the hanging profiles, as described in Pole Mount Preliminary Assembly on page 14. Ceragon Proprietary and Confidential Page 141 of 167...
  • Page 142 Installation Guide 4 Tighten the screws between both DCBs and the assembled OCBs. 5 Mount the radio to the OCBs, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 142 of 167...
  • Page 143 6 Attach an S-bend between the new OCB and the one close to it. Do this for both pole mounts. 7 Mount two terminations to the new OCBs, as described in Termination Installation on page 18. Ceragon Proprietary and Confidential Page 143 of 167...
  • Page 144: Upgrading From 3+3 Hsb Sp To 4+4 Hsb Sp

    List of Additional Items per Terminal Description Marketing Model Quantity RFU-HP-1R-f or RFU 1Rx 15HPS-1R-RFU-f OCB with filters 15OCBfx-xxxY-aa-L/H OCB-Sbend OCB-SBend-f 15HP Short for WRccc 15HP-SHORT-ccc Procedure 1 Start with a 3+3 HSB configuration. Ceragon Proprietary and Confidential Page 144 of 167...
  • Page 145 4 For the two new radios on the rear side, mount shorts to the DIV ports using screws and washers supplied in short kit, as described in Short Installation on page 17. Ceragon Proprietary and Confidential Page 145 of 167...
  • Page 146 FibeAir® 1500HP/RFU-HP Installation Guide 5 Mount one new radio to each pole mount bracket, as described in Outdoor Branching Network (OBM) Housing Hanging Procedure on page 25. Ceragon Proprietary and Confidential Page 146 of 167...
  • Page 147 6 Mount two S-Bends in the top and bottom assemblies between the EXT port of radio 3 and the MAIN port of radio 4, as described in Installing S- Bends and the DCB on page 16. Ceragon Proprietary and Confidential Page 147 of 167...
  • Page 148 FibeAir® 1500HP/RFU-HP Installation Guide Ceragon Proprietary and Confidential Page 148 of 167...
  • Page 149: Split Trunk Configurations

    1+1 HSB SD 2+2 HSB XPIC SD HSB Configurations (1+1/2+2) Configuration OCB DCB U-bend S-bend Coupler 3dB Coupler Term. Cover/Short Pole Mount 1+1 HSB 1+1 HSB SD 2+2 XPIC HSB 2+2 XPIC HSB SD Ceragon Proprietary and Confidential Page 149 of 167...
  • Page 150: N+0/N+1 Single Pole Configurations (N = 1 To 5)

    FibeAir® 1500HP/RFU-HP Installation Guide N+0/N+1 Single Pole Configurations (N = 1 to 5) 20.2 1+1/2+0 2+1/3+0 3+1/4+0 4+1/5+0 1+0 SD 1+1/2+0 SD 2+1/3+0 SD 3+1/4+0 SD 4+1/5+0 SD Ceragon Proprietary and Confidential Page 150 of 167...
  • Page 151 Single Pole Configurations N+0/N+1 (N = 1 to 5) Configuration OCB DCB U-bend S-bend Term. Cover/Short Pole Mount 1+0 SD 1+1/2+0 1+1/2+0 SD 2+1/3+0 2+1/3+0 SD 3+1/4+0 3+1/4+0 SD 4+1/5+0 4+1/5+0 SD Ceragon Proprietary and Confidential Page 151 of 167...
  • Page 152: N+0/N+1 Ccdp Configurations (N = 1 To 5)

    FibeAir® 1500HP/RFU-HP Installation Guide N+0/N+1 CCDP Configurations (N = 1 to 5) 20.3 2+0 XPIC 2+1 XPIC 3+1 XPIC 4+1 XPIC 2+0 XPIC SD 2+1 XPIC SD Ceragon Proprietary and Confidential Page 152 of 167...
  • Page 153 CCDP Configurations N+0/N+1 (N = 1 to 5) Configuration OCB DCB U-bend S-bend Term. Cover/Short Pole Mount 2+0 XPIC 2+0 XPIC SD 2+1 XPIC 2+1 XPIC SD 3+1 XPIC 3+1 XPIC SD 4+1 XPIC 4+1 XPIC SD Ceragon Proprietary and Confidential Page 153 of 167...
  • Page 154: N+0/N+1 Ccdp Configurations (N = 5 To 10)

    FibeAir® 1500HP/RFU-HP Installation Guide N+0/N+1 CCDP Configurations (N = 5 to 10) 20.4 5+1 XPIC 6+1 XPIC 7+1 XPIC 8+1 XPIC 9+1 XPIC Ceragon Proprietary and Confidential Page 154 of 167...
  • Page 155 FibeAir® 1500HP/RFU-HP Installation Guide 5+1 XPIC SD 6+1 XPIC SD 7+1 XPIC SD 8+1 XPIC SD Ceragon Proprietary and Confidential Page 155 of 167...
  • Page 156 OCB DCB U-bend S-bend Term. Cover/Short Pole Mount 5+1 XPIC 5+1 XPIC SD 6+1 XPIC 6+1 XPIC SD 7+1 XPIC 7+1 XPIC SD 8+1 XPIC 8+1 XPIC SD 9+1 XPIC 9+1 XPIC SD Ceragon Proprietary and Confidential Page 156 of 167...
  • Page 157: All Indoor Horizontal Installation

    The All-Indoor horizontal placement is available for the following configurations:   1+0 East/West   1+1 East/West The IDU can be installed above or below the RFUs as shown in the following illustrations. 1+1 SD IP-10 1+0 IP-10 Ceragon Proprietary and Confidential Page 157 of 167...
  • Page 158: 1+0 Installation

    1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter (MK-3230-0), and fasten the Termination Plates to the Adapter using 16 screws (4 in the table above) and 16 washers (3), as shown in the following illustration. Ceragon Proprietary and Confidential Page 158 of 167...
  • Page 159 2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8 screws (number 2 in the table above) 8 washers (3), and another 8 washers (1), as shown in the following illustration. 3 Repeat step 2 above for the right bracket. Ceragon Proprietary and Confidential Page 159 of 167...
  • Page 160 FibeAir® 1500HP/RFU-HP Installation Guide The following illustrations show the New OCB assembled with the 19” Rack Adapter. Ceragon Proprietary and Confidential Page 160 of 167...
  • Page 161: 1+0 East-West Installation

    2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8 screws (number 2 in the table above) 8 washers (3), and another 8 washers (1), as shown in the following illustration. Ceragon Proprietary and Confidential Page 161 of 167...
  • Page 162 FibeAir® 1500HP/RFU-HP Installation Guide 3 Repeat step 2 above for the right bracket. Ceragon Proprietary and Confidential Page 162 of 167...
  • Page 163 FibeAir® 1500HP/RFU-HP Installation Guide The following illustrations show the New OCB assembled with the 19” Rack Adapter. Ceragon Proprietary and Confidential Page 163 of 167...
  • Page 164: 1+1 Hsb (Hot Standby) Installation

    1 Insert the termination gaskets in their places on the OCB 19” Rack Adapter (MK-3230-0), and fasten the Termination Plates to the Adapter using 24 screws (4 in the table above) and 24 washers (3), as shown in the following illustration. Ceragon Proprietary and Confidential Page 164 of 167...
  • Page 165 2 Fasten the left bracket to the OCB 19” Rack Adapter (MK-3230-0) using 8 screws (number 2 in the table above) 8 washers (3), and another 8 washers (1), as shown in the following illustration. 3 Repeat step 2 above for the right bracket. Ceragon Proprietary and Confidential Page 165 of 167...
  • Page 166 10 screws (number 4 in the table above), and 10 washers (5), as shown in the following illustration. The following illustrations show the New OCB assembled with the 19” Rack Adapter. Ceragon Proprietary and Confidential Page 166 of 167...
  • Page 167: Appendix A: Electrical Diagrams

    FibeAir® 1500HP/RFU-HP Installation Guide Appendix A: Electrical Diagrams Ceragon Proprietary and Confidential Page 167 of 167...
  • Page 168 Initial Installations Following are the Initial Installations configurations: 1+0 SP 1+0 Sp DP 2+0 DP 2+0 SD DP 2+0 SP 20+ SD DP 1+1 HSB SD DP 2+2 SD SP 2+2 HSB SP...
  • Page 169 1+0 SP OCB kit Antenna 1+0 SD SP OCB kit Antenna Antenna Div.
  • Page 170 2+0 DP OCB kit Antenna OCB kit Antenna 2+0 SD DP OCB kit Antenna Main V Antenna Div. V OCB kit Antenna Main H Antenna Div. H...
  • Page 171 2+0 SP OCB kit Antenna OCB kit 2+0 SD SP OCB kit Antenna Main OCB kit Antenna Div. Term.
  • Page 172 1+1 HSB SP OCB kit Antenna OCB kit Duplicate for 2+2 HSB DP (same set for V & H polarizations)
  • Page 173 1+1 HSB SD SP OCB kit Antenna Antenna Div. OCB kit Duplicate for 2+2 SD DP (same set for V & H polarizations)
  • Page 174 2+2 SD SP OCB kit Antenna Main OCB kit Antenna Div. Term. OCB kit OCB kit Term.
  • Page 175 2+2 HSB SP OCB kit Antenna OCB kit OCB kit OCB kit...
  • Page 176 Installations Upgrades Following are the Installations Upgrades configurations: From 1+1 HSB 2+2 HSB SP 3+3 HSB SP 4+4 HSB SP From 1+1 HSB 2+2 HSB DP 3+3 HSB DP 4+4 HSB DP From 1+1 SD SP 2+2 SD SP 3+3 SD SP 4+4 SD SP From 1+1 SD SP 2+2 SD DP...
  • Page 177 4+4 HSB SP 1+1 HSB SP 2+2 HSB SP 3+3 HSB SP OCB kit OCB kit OCB kit OCB kit Antenna Antenna Antenna Antenna Added Acc.: 2x S-Bend WG 1x Flex WG OCB kit OCB kit OCB kit OCB kit OCB kit OCB kit OCB kit...
  • Page 178 3+3 SD SP 4+4 SD SP 1+1 SD SP 2+2 SD SP OCB kit OCB kit OCB kit OCB kit Antenna Antenna Antenna Antenna Main Main Main Main Antenna Div. OCB kit OCB kit OCB kit OCB kit Antenna Antenna Antenna Div.

This manual is also suitable for:

Fibeair 1500rfu-hp

Table of Contents