Download Print this page

easyteck T900 Manual page 5

Advertisement

When recharging is complete unplug the charger from the wall outlet and from the phone itself. The phone may
be slightly warm.
Battery details
Battery
Duration in standby
Lithium ion battery
Approx. 5 days
− The battery will reach its maximum capacity after being recharged 2-3 times.
− While recharging, maintain the temperature between 0° C and 40° C..
− In time the battery will gradually wear out and therefore take longer to recharge. This is normal.
− Continuous recharging for a long time can damage the battery and the charger. For this reason it is necessa-
ry to disconnect the device when recharged.
Basic functions
Power ON/OFF
To turn on or turn off the phone press the red button. When turned on the following information may appear:
SIM card lost or inserted incorrectly. SIM card is corrupted or invalid. If your SIM card is valid, but protected by
a PIN, enter the code and press ok.
Use the delete key to erase.
Conversation time
Approx. 10 hours
8
Warning
If an incorrect PIN code is entered various times, the display will show how many possibilities remain for ente-
ring the correct PIN code. Once you have exhausted the possibilities, the mobile phone informs the user that
the SIM card is locked. Enter the PUK code to unblock it.
Take the following steps:
1. Enter your PUK code and confirm
2. Enter the new PIN code and confirm
3. Change language, time and date
The default language is set by the SIM card. Refer to the chapter with information on how to change the
language, time and date.
Making a call
Phone main menu screen -> enter phone number -> press the green button to start the call.
The screen backlight turns off if, during the call, no action is taken for 5 seconds. By pressing the power
button, the dial keys or buttons on the side, it will reactivate the screen backlight.
Answering/Terminating a Call
Answering a phone call
Press the green button to answer.
Terminating a call
Press the red button to terminate a call.
9

Advertisement

loading