Quick Installation; Product Description - MAGUIRE Novatec AL-1 Instruction Manual

Compressed air loader
Table of Contents

Advertisement

Al-1 Compressed Air Loader Instructions

QUICK INSTALLATION

1. Mount the chamber and filter/regulator with gauge assemblies.
2. Connect the material pick-up device.
3. Connect the compressed air.
4. Plug the power cord into a 115-volt outlet.
For full installation details, refer to the Installation section beginning on page 7.

PRODUCT DESCRIPTION

Novatec Model AL-1 loaders are automatic compressed air venturi loaders designed to convey virgin
pellets and regrind material from storage containers to drying hoppers or directly to process machines,
using compressed air.
The AL-1 is shipped complete, ready for quick set-up and use.
Novatec compressed air loaders only require a 14.0 SCFM @ 40 PSIG compressed air supply and 115
volt outlet for a typical operation.
The loader cyclone and sight glass are hopper or machine mounted with a single inlet, supplied with a
4" or 6" square blank mounting flange. The flange is normally supplied undrilled to allow the user to
drill the appropriate mounting pattern for a particular machine.
The AL-1 loader utilizes a "slip-fit" design for easy assembly. The receiving hopper slips into the sight
tube which in turn slides onto the mounting adapter; this process requires no tools and little time for
both installation and cleaning.
© 2011 Novatec Inc. All Rights Reserved
4
AL-1 IM 10-20-2011

Advertisement

Table of Contents
loading

Table of Contents