GreenWorks GBB 700 Owner's Manual page 11

82v dual port backpack blower
Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY
ASSEMBLING THE TRIGGER HANDLE (See Fig.2)
1. Slide trigger handle (A) on the front tube (B).
2. Move trigger handle to desired location before fully tightening. Use supplied knob (C) to tighten
trigger handle to the blower tube.
3. Place the cord (E) in the cord retainer (F).
ASSEMBLING THE BLOWER TUBE (See Fig.3-Fig.4)
1. The flexible tube (D) is connected to the fan outlet tube from the manufacturer.
2. Align either of the grooves (a) in tube (G) with the tabs (b) on tube (B). Turn the tube in the direction
of the arrow until both of the tabs slide into the lock positions (c).
3. Connect tube (H) to tube (G). For shorter tube application, turn rear tube counterclockwise and
move tube to upper position (d).
c
G
B
b
a
d
A
D
F
C
H
11
E
Fig. 2
G
Fig. 3
Fig. 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents