Complete The Installation - Kohler K-3393 Installation Manual

Hide thumbs Also See for K-3393:
Table of Contents

Advertisement

Available languages

Available languages

Turn here to adjust
the water level.

4. Complete the Installation

Remove the Packing Material
NOTE: Do not remove the pump hose clamps.
Remove and discard the protective materials used in shipping.
Cut the wire holding the pump to the back wall of the toilet.
Discard the wire tie.
If the pump has shifted during shipping or installation, reposition
it so it is not touching the back side wall of the toilet.
Complete Connections
Connect the supply shut-off valve to the toilet supply shank.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight tightening of
the nuts should stop leakage.
Install the toilet seat according to the packed instructions.
Plug the toilet electrical cord into a Class A GFCI or ELCB
receptacle.
Adjust the tank water level to the proper marked waterline by
rotating the threaded rod clockwise to raise the water level or
counterclockwise to lower the water level.
Carefully set the cover onto the tank.
Kohler Co.
1.6 gpf
(6 lpf)
7
1057478-2-B

Advertisement

Table of Contents
loading

Table of Contents