5) Insert the other side of the power cable to the outlet.
6) Turn ON the power switch [1] of the PS unit.
7) Turn ON the power of the host machine.
1.4 Checking the Operation After Making Settings
1.4.1 Checking the Operation
Output a test page and setting page in the following procedure to check the connection between the host machine and this equipment and this equipment's setting.
To print the setting information page:
1) With [Idle] status, press menu button once.
2) Press a select button and select "Print pages".
3) Press a select button and select "PS/PCL Test page".
4) Press a select button and select "Configration".