Page 1
ERM100-L-IM-01 www.edbakproav.com ERM100-L ELECTRIC FULL SERVICE VIDEO WALL MOUNT WITH MICRO ADJUSTMENT UCHWYT SCIENNY WYSUWANY ELEKTRYCZNIE Z MIKRORERULACJA...
Page 2
The assembly should be carried out in accordance with this manual by at least two fully qualified people. The EDBAK Company shall not be liable for any injuries or damage to material or property caused by incorrect assembly. Hence please ensure that: during the assembly all the instructions are followed carefully.
PART LIST LISTA ELEMENTÓW ERM100-L-IM-01 www.edbakproav.com 10A 120W 230VAC/12VDC 5,5 x 2,1mm low voltage dc cable DC 5,5/2,1 socket, 1 for 5 mounts DC 5,5/2,1 plug x5; straight; 0,5mm2 13.05.2019, ERM100-L-IM-01...
Page 4
PART LIST LISTA ELEMENTÓW ERM100-L-IM-01 www.edbakproav.com M4x20 M5x20 M6x20 M8x20 fi15 x fi8,4 x 5 fi15 x fi8,4 x 10 13.05.2019, ERM100-L-IM-01...
Page 5
PART LIST LISTA ELEMENTÓW ERM100-L-IM-01 www.edbakproav.com DC 5,5/2,1 plug, DC 5,5/2,1 socket; straight; 0,5mm2; 2m 6x80 13.05.2019, ERM100-L-IM-01...
ASSEMBLY MONTAZ ERM100-L-IM-01 www.edbakproav.com CHECK THE POSITION OF FRAME INSTALLATION TO WOOD STUD WALL 13.05.2019, ERM100-L-IM-01...
Page 8
ASSEMBLY MONTAZ ERM100-L-IM-01 www.edbakproav.com CHECK THE POSITION OF FRAME MULTIPLE DISPLAY ASSEMBLY - WITHOUT SPACERS A = DISPLAY WIDTH DISPLAY WIDTH 13.05.2019, ERM100-L-IM-01...
Page 13
To move the mechanism, hold the large button with the white triangle. The button should be held until the mechanism reaches the required position. If the technical conditions make it impossible to maintain communication with the module, it will automatically disconnect and return to the list of devices. 13.05.2019, ERM100-L-IM-01...
Need help?
Do you have a question about the ERM100-L and is the answer not in the manual?
Questions and answers