General Overview MTC-1000 Specifications Nominal Flow Rate……………………………………………. 15 GPM/900 GPH (56.8 LPM/3407 LPH) 7,200 gallons (27,255 liters) per 8-hour run 21,600 gallons (81,765 liters) per 24-hour run Primary Filter………………...………………………………… Mechanical Water Separator Secondary Filter……………………………………………….. 1, 3, 10, or 25μ Fine Filter or 3, 10μ Water Block Fuel Conditioner………………………………………………..
Phase 1 AXI recommends 3 phases to successfully polish a fuel tank. This will ensure all contaminates are removed and the fuel is in optimal condition. The goal of Phase One is to remove any free water and sludge from the bottom of the tank without mixing the water into an emulsified state within the fuel.
3. To remove as much of the free water and sludge as possible, the Suction Hose (with a straight wand or pipe attachment) should be placed at the deepest part of the tank. 4. Turn on the Pump and be prepared to immediately switch it off once the fluid begins to fill the discharge container. 5.
Primary Inspection Upon arrival, the system and accessories must be visually inspected before installation. Improper handling during shipping may cause physical or electrical problems. Immediately report or note any damages to the shipper. Checklist If the packing crate shows signs of damage inspect the system for damage. Check the entire system for damage that could indicate internal mechanical or electrical problems.
Priming the System The pump supplied with the system is NOT automatically self-priming and must not be run dry. !WARNING! If the pump is allowed to run without fuel, pump damage can occur. Priming Procedure Before turning on the pump make sure the entire suction side of the system (suction hose, primary filter/water separator, plumbing, and pump) is primed and filled with oil/diesel fuel.
Maintenance The system should be visually inspected and tested a minimum of every six (6) months according to the procedure below during light duty cycles. Monthly inspections are recommended for systems that are being used in excess of an average of eight (8) hours a day and five (5) days a week. Preventative Maintenance Prior to performing the maintenance procedure ensure that: 1.
Troubleshooting Symptom Troubleshooting Guide No fuel delivery Noisy operation 1. Pump does not run 1. Insufficient fuel supply 2. Pump is not primed 2. Air leaks in the inlet pipe 3. Fuel supply or return line blocked 3. Air or gas in fuel on the suction side 4.
This warranty is not intended to supplant normal inspection, care and service of the products covered by the user, and shall not obligate AXI International to provide free service during the warranty period to correct breakage, maladjustment, or other difficulties arising out of abuse, misuse, or improper care and maintenance of such products. Our...
AXI International reserves the right at any time to make changes in the design, material, function and specifications of its products. Any such changes shall not obligate AXI International to make similar changes in such products that were previously manufactured.
Fort Myers, FL 33905 Tel: +1-239-690-9589 Fax: +1-239-690-1195 Email: info@axi-international.com Internet: www.axi-international.com Please provide the following information: Serial Number of your system, the required part numbers and quantity. The drawings/parts list included in this manual are the most accurate source of part numbers.