Operation Instructions; Setting Up Your Alpha Grinder; Prior To Operation; Changing Or Installing Tooling - Bartell Global CONTEC ALPHA Owner's Manual And Parts Book

Table of Contents

Advertisement

ALPHA FLOOR GRINDER
OWNER'S MANUAL AND PARTS BOOK

SETTING UP YOUR ALPHA GRINDER

Your Alpha Floor Grinder comes fully assembled with handle and motor fully installed.
The handle is folded to allow for easier transportation. The handle can be moved into operating
position by loosening the black knob and unfolding the handle into the up-right position. The
black knob can then be reinstalled to secure handle in place. Tooling can now be installed, and
your Floor Grinder is ready for use.

PRIOR TO OPERATION

• Make sure that all dust, debris etc., are thoroughly removed from the unit prior to
operation. Special effort should be given to the bottom of the machine where the tooling
plate is located.
• Check all bolts and screws for tightness and make sure all bolts and screws are securely
tightened. Loose bolts and screws may cause damage to the unit. Make sure tooling is
properly installed.

CHANGING OR INSTALLING TOOLING

• Tilt the machine onto the back wheels and rest it on the handlebar.
• All tool discs are fixed with three Allen screws to the tool bracket.
• Remove the screws with an 8mm Allen key.
• Check the grinding tool for wear and tear for the next application.
• Fix new tools
• Adjust the different heights of the tools by changing the position of the rear wheel swing.
The motor axis of the grinder must be 90° level to the floor.
ATTENTION: Before working on the grinder bring the motor to a total stand still and
disconnect from the power supply.
CAUTION: Tools can be hot after use.

OPERATION INSTRUCTIONS

9
OIPB – C15001

Advertisement

Table of Contents
loading

Table of Contents