Download Print this page

OMS EMERGENCY 2990 Assembly Instructions page 2

Advertisement

4
CONNECTION OF AUTONOMOUS FITTING
!
CONNECTION BATTERY
4a
CONNECTION AND SETUP OF FITTING TO CENTRAL BATTERY
!
ADDRESS
CONFIGURATION
4b
CONNECTION OF FITTING TO FZLV CENTRAL BATTERY
Risk of electric shock
POWER SUPPLY
220÷240VAC/50÷60Hz
Risk of electric shock
POWER SUPPLY
220÷240VAC/50÷60Hz
175÷275VDC
POWER SUPPLY
24VDC
4c
CONNECTION OF FITTING TO RUBIC SYSTEM
!
CONNECTION BATTERY
CONNECTION COMMUNICATIONS
5
SURFACE ASSEMBLY
PRODUCER'S GUIDLINES RELATED TO INSTALLATION PROCEDURE:
- in a fitting the cable L and L1 is required to the maintained mode (SA)
,the non maintained mode (SE) does not require L1 cable
- It is possible to use the included jumper to short circuit L and L1
- during the battery connection, pay attantion to proper polarisation
„+" and „-"
- The first if all you have to connect battery to inverter and then
connect the mains supply
- during the communication cables connection, pay attantion to isolation of
the cable's shield which can lead to a short circut of the others
communication lines
- CBS fiting address cannot be doubled in a single circut
- during connection to the FZLV system, keep the proper polarisation„+" , „-"
- the drawing enclosed in this instruction may be vary than in the finished
products, to a proper connection follow the instruction enclosed in the label
attached on a fitting
- Select the wiring diagram according to the luminaire version
- n the case of mounting flush fitting in suspended ceilings refer to the
instructions of installation, included the manufacturer's instructions ceiling
- in Rubic System It is needed to place on a building plan, an fitting's address
in a place of itnstallation. The address is placed on a fitting's housing
Risk of electric shock
POWER SUPPLY
220÷240VAC/50÷60Hz
SURFACE ASSEMBLY
4x

Advertisement

loading