Page 1
Important Notices The controlling components are driven by an electric circuit. Some programmed parameters will be lost as a power outage over 48 hours, and water softener system will carry out the regeneration process at the incorrect time. We strongly recommend that after a power outage, users should check the timer.
ЎSalt level should be higher than water level at first time. There should be Brine: Under certain concentration and flow rate conditions, brine flow through entire resin bed, then the saturated resins will resume their enough solid salt at anytime. softening capacity.
Page 4
The bypass valve Adapter Coupling Adapter Coupling for Flow meter F i x t h e d r a i n pipe well above the floor drain Mounting Clip Flow Meter Socket Bypass Body The water enters 4cm air gap the valve.
b) When system is at other states, it displays the following images: Controller Operation Instruction Work State Showing Content Description Control Panel 10:30:00 current time. 2Min represents the balance time Back wash of this state, unit minute, count down. ˇ 3 0 M i n r e p r e s e n t s t h e Down Display Screen...
Select key Inquiring and Establishment a) Press this key to enter into menu, press Up or Down key, to show each of Each Parameter parameter value. b) After entered into menu, press this key again, to show parameter adjusting image, the parameter flickers. 1.
Page 7
2. System setting menu (Taking ASD2 as an example to illustrate) Caution: The value of 08 is After you turn on the system, during it displays the valve type, if you just taken as an example. DO press ESC and key in turn, it will display the system setting NOT change the parameter, otherwise the water may not...
Troubleshooting How to begin a regenerate progress manually At service state, press the ESC key and you will hear the motor running. The screen shows: Problem Possible Cause Solution 1.Transformer is not plugged in 1 . C o n n e c t t o c o n s t a n t Controller does not 2.Defective power cord power source...