Toro 68130 Installation Instructions page 2

Tow pole hitch for end-dump concrete mixers

Advertisement

Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
1
Parts needed for this procedure:
1
Tow pole
1
Front stabilizer leg (shipped with the machine)
6
Short bolt
1
Long bolt
7
Locknut
Procedure
1. Lower the rear stabilizer legs; refer to the machine
Operator's Manual.
2. Place jack stands under the front frame rail to prevent
the machine from tipping forward (Figure 1).
WARNING
Mechanical or hydraulic jacks may fail to
support the machine and cause serious injury.
Use jack stands when supporting the machine.
Description
Tow pole
Front stabilizer leg (shipped with the
machine)
Short bolt
Long bolt
Locknut
Hitch assembly
Flange-head bolt
Locknut
Safety chain
Connecting link
Qty.
1
1
Install the tow pole.
6
1
7
1
2
Install the hitch assembly.
2
1
Install the safety chain and connecting
links.
2
1
1. Support points
3. Remove the 2 nuts and bolts that secure the front
stabilizer leg to the frame (Figure 2), and remove the
front stabilizer leg.
1
1. Front stabilizer leg
4. Install the tow pole into the opening at the front of the
machine, and secure it with 6 short bolts and 6 locknuts
torqued to 102 N-m (75 ft-lb); refer to Figure 3.
2
Use
G021091
Figure 1
Figure 2
G021092