Sunwave CROSSFIRE N2 NANO POWER Installation Manual

Octa band digital radios 20dbm per band integrated antennas integrated bluetooth

Advertisement

INSTALLATION MANUAL
N2
NANO POWER
Octa Band Digital Radios
20dBm per Band
Integrated Antennas
Integrated Bluetooth

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CROSSFIRE N2 NANO POWER and is the answer not in the manual?

Questions and answers

Summary of Contents for Sunwave CROSSFIRE N2 NANO POWER

  • Page 1 INSTALLATION MANUAL NANO POWER Octa Band Digital Radios 20dBm per Band Integrated Antennas Integrated Bluetooth...
  • Page 2 Sunwave. The information furnished herein is believed to be accurate and reliable. However, no responsibility is assumed by Sunwave for its use, or for any infringements of patents or other rights of third parties resulting from its use.
  • Page 3: Table Of Contents

    N2RU Ceiling Installation (with suspended ceiling)..........................17 Assemble Bracket I&II..................................17 Place the bracket..................................17 Assemble Bracket II..................................18 Buckle Up and Connect Wire...............................19 To perform maintenance on the N2RU............................20 Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 3 of 24...
  • Page 4 N2RU Ceiling Installation (without suspended ceiling)........................21 Draw Circles for plastic expansion nails............................21 Assemble Mounting Bracket...............................22 Buckle Up and Connect Wire..............................22 To perform maintenance on the N2RU............................24 Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 4 of 24...
  • Page 5: General

    This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 5 of 24...
  • Page 6: Site Considerations

    The equipment has to operate at humidity level and temperature range as follow: Maximum humidity: 85% Temperature range: -10 to 40℃ Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 6 of 24...
  • Page 7: Preparation

    Open the shipping packages carefully for each unit from the protective packing sponge. Ensure that all equipment and accessories have been delivered. Ensure that all equipment and accessories have no damage. If there is any damage, contact your Sunwave service agent. A2 Accessories Contact us today: www.sunwaveglobal.com...
  • Page 8 NANO POWER 20dBm Octa Band Digital Radio EU-O Accessories Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 8 of 24...
  • Page 9 NANO POWER 20dBm Octa Band Digital Radio N2 Accessories Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 9 of 24...
  • Page 10: Tools

    20dBm Octa Band Digital Radio Tools Electric drill, cross screw, cutter, ladder and other tools are needed for N2RU installation which are not offered from Sunwave for now. All of these tools are for customers to prepare Philips Screwdriver Drilling Machine...
  • Page 11 2T2R - B25, B66 2T2R - B25, B66, B7 2T2R - B5, B25, B66, B7 4T4R - B25, B66 Power connector is stripped and tinned as below. Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 11 of 24...
  • Page 12: Installation Of The A2

    Note: the sliding rails is not included in delivery. Figure 3. Attached Sliding Rails Place the A2 in the rack (Figure 4) Figure 4. Place A2 in Rack Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 12 of 24...
  • Page 13: Connect Power And Ground Cable To A2

    Figure 7. Connect Power Cable at Rear Side Connect and screw the ground wire at the A2 rear side (Figure 8). Figure 8. Connect Ground Cable at Rear Side Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 13 of 24...
  • Page 14: Mount The A2 On The Wall

    Figure 10. Marking position of mounting holes Attach the dowels, expansion screws or the like and fasten the A2 to the wall (Figure 11). Figure 11. Mounting completed Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 14 of 24...
  • Page 15: Connect Power And Ground Cable To A2

    Figure 12. Connect power cable at rear side Connect and screw the ground wire at the A2 rear side (Figure 13) Figure 13. Connect ground cable at rear side Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 15 of 24...
  • Page 16: Installation Of The Eu-O

    Mount the EU-O on the Wall Proceed as described under Mount the A2 on the Wall to mount the EU-O on the wall and connect the power and the ground cable Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 16 of 24...
  • Page 17: Installation Of The N2Ru

    Figure 15. Lacing Mounting Bracket Place the bracket 1. Drill a hole with diameter of 90mm for putting Mounting Bracket I & IV on ceiling upside. Figure 16. Drilling a Hole Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 17 of 24...
  • Page 18: Assemble Bracket Ii

    X M6 X 70 screws, Flat Washer M6 and Spring Washer M6. Note: Mounting Bracket III is already assembled into N2RU in factory Figure 19. Assemble bracket II Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 18 of 24...
  • Page 19: Buckle Up And Connect Wire

    3. Connect power cable and fiber cable to N2RU Figure 21. Wire Connection Diagram 4. Buckle the rotary hook side of N2RU to Mounting Bracket III Figure 22. Installation Completed Diagram Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 19 of 24...
  • Page 20: To Perform Maintenance On The N2Ru

    1. Press the button of hook at N2RU to expose top panel of N2RU for debugging and maintenance Figure 24. Unlock Rotary Hook Diagram 1 Figure 25. Unlock Rotary Hook Diagram 2 Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 20 of 24...
  • Page 21: N2Ru Ceiling Installation (Without Suspended Ceiling)

    2. Drill 2 holes with diameter of 10mm and depth of 55mm at the position in step 1 Figure 27. Drilling Holes Diagram 1 3. Insert plastic expansion nails into holes by hammer Figure 28. Insert Plastic Expansion Nails Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 21 of 24...
  • Page 22: Assemble Mounting Bracket

    Figure 30. Assembling Bracket III Diagram 2 Buckle Up and Connect Wire 2. Buckle the bar side of N2RU up to Mounting Bracket III. Figure 31. Buckle up Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 22 of 24...
  • Page 23 4. Buckle the rotary hook side of N2RU to Mounting Bracket III Figure 33. Installation Completed Diagram 7. Tighten the M3 x 3 screws Figure 34. Tighten N2RU Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 23 of 24...
  • Page 24: To Perform Maintenance On The N2Ru

    1. Press the button of hook at N2RU to expose top panel of N2RU for debugging and maintenance Figure 35. Unlock Rotary Hook Diagram 1 Figure 36. Unlock Rotary Hook Diagram 2 Contact us today: www.sunwaveglobal.com marketing@sunwaveglobal.com © Sunwave IM_CF_N2 v1.0.1 | 24 of 24...

Table of Contents