INSTALLATION PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING Calculation before Installation To calculate installation, please refer to TABLE 1. (All calculation in inches.) TABLE A = Height of Floor to Ceiling B = Height of Floor to Counter Top (Standard: 36”) C = Preferred Height of Counter Top to Hood Bottom 30”...
Page 2
Figure 1 Preparation before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. Decide the location of the venting pipe from the hood to the outside. (Figure 1) A straight, short venting run will allow the hood to perform more efficiently.
Page 3
Hood Installation Figure 4 CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 1. Using references in Table 1 and measurements on Page 12, mark the leveling locations point for hood-mounting bracket on the wall.
Page 4
Figure 7 Duct Cover Installation 6. Use 6” round steel pipe for 30” and 36” models or 8” round steel pipe for 48” models (follow building codes in your area) to connect the exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight.
Need help?
Do you have a question about the RAX95 SQB-1 and is the answer not in the manual?
Questions and answers