Download Print this page

Philips PureForm Installation Instructions page 2

Led bollard

Advertisement

INSTALLATION INSTRUCTIONS
STANDARD INSTALLATION
NOTE: ANCHOR BASE IS SECURED TO GROUND WITH 3/8" BOLTS (BY OTHERS). STRUCTURAL MEMBERS MUST BE
PRESENT IN GROUND TO ACCEPT BOLLARD BASE. SOME COMPONENTS SEEN IN VIEW MAYBE DIFFERENT FROM
THE PRODUCT RECEIVED. LUMINAIRE WILL STILL BE INSTALLED THE SAME AS SHOWN IN INSTRUCTION SHEET.
BOLLARD SHAFT
ANCHOR BASE
LUMINAIRE
INPUT LEADS
SUPPLY LEADS
1-1/2" CONDUIT
CONCRETE
FOUNDATION
(BY OTHERS)
© 2018 Philips Lighting Holding B.V. All rights reserved.
www.philips.com/luminaires
P/N 443560819190 Rev A
Page 2 of 4
4X 5/16-18 X 3/4" HEX
HEAD SCREWS
(SUPPLIED)
4X 3/8" LOCKWASHERS
& 3/8-16 LOCKNUTS
(BY OTHERS)
4X 3/8"X9"X1-1/2"
ANCHOR BOLTS
(BY OTHERS)
PUREFORM BOLLARD (PBL)
1.
INSTALL FOUR (4) 3/8" X 9" X 1-1/2" ANCHOR BOLTS
INTO CONCRETE FOUNDATION (BY OTHERS) UTILIZ-
ING TEMPLATE PROVIDED, (SEE BASE DETAIL ON
PAGE 4). ENSURE ANCHOR BOLTS PROJECT 1-1/2"
ABOVE CONCRETE SURFACE. CONDUIT PROJEC-
TION TO BE 1-1/2" MAXIMUM (BY OTHERS).
2.
REMOVE LUMINAIRE FROM SHIPPING CARTON. UN-
SCREW (4) 5/16-18 X 3/4" HEX HEAD SCREWS FROM
BASE OF BOLLARD SHAFT TO DETACH THE AN-
CHOR BASE.
3.
PLACE BOLLARD ANCHOR BASE ONTO THE FOUR
PREINSTALLED ANCHOR BOLTS. INSTALL FOUR (4)
3/8" LOCKWASHERS AND FOUR (4) 3/8-16 LOCK-
NUTS. SECURE ANCHOR BASE IN POSITION BY
TIGHTENING LOCKNUTS 20 FT-LBS OF TORQUE.
4.
MAKE ELECTRICAL CONNECTIONS. FIXTURE LINE
(BLACK) TO SUPPLY LINE, FIXTURE COMMON
(WHITE) TO SUPPLY COMMON AND GROUND
(GREEN) TO GROUND.
5.
PLACE SPLICES AND EXCESS WIRE IN BOLLARD
SHAFT. BE SURE TO NOT PINCH WIRES. CAREFUL-
LY SET BOLLARD UPRIGHT ON ANCHOR BASE.
6.
ALIGN SCREW HOLES ON SHAFT WITH ANCHOR
BASE AND SCREW IN THE FOUR 5/16-18 X 3/4" HEX
HEAD SCREWS THAT WERE REMOVED IN STEP 2.
TIGHTEN TO 10 FT-LBS OF TORQUE.

Advertisement

loading

This manual is also suitable for:

Pbl