Download Print this page

Pioneer 4020B Installation Manual page 6

Single handle tub and shower valve set

Advertisement

7. Turn on main water supply to flush all the debris then turn off main wa-
ter supply. For all installations, install caps (L) on the bath and shower
nipples (E & F). Turn on the hot and cold water supplies and check for
any leaks.
8.
For thick or thin wall installation refer to the drawings and to Step (1).
For more care information or trouble shooting inquiries about your
Pioneer Product, please see the contact information on the back page.
Valve Installation
6
REV-12 18, 12

Advertisement

loading