TECHNO-AC SUCCESS ATP-434N Operating Instructions Manual page 5

Water leak detector
Table of Contents

Advertisement

2. Set the receiver on the holder
3. Put one end of the holder below protective rubber of the receiver.
4. Put other end of the holder below the second rubber
5. The receiver is ready for the operation.
It is recommended to adjust the length of the neck strap for more comfort during operation.
5

Advertisement

Table of Contents
loading

Related Products for TECHNO-AC SUCCESS ATP-434N

Table of Contents