4.8 Installation Checklist
y Rack mount ears configured for 19/23 in.
y Ears mounted to panel and rack securely
y Input power cables/lug and return cables/lugs securely bolted/connected to rear
of panel
y Heat shrink installed on cables
y Fuse fail alarm contacts wired to remote monitoring device (if required)
y Fused outputs wired with correct polarity, crimp lugs, wire lacing, or cable tie
routing to equipment loads
y Output connections secured
y Fuses sized as required for each load
y All safety covers attached
GMT/KLM 125 FUSE PANEL
SETUP AND OPERATION MANUAL
PAGE 8 - INSTALLATION