7 Start-up
If the value is below 6.5 or above 8.5, clean the installa-
tion and treat the heating water.
Ensure that oxygen cannot get into the heating water.
Checking the filling and supplementary water
Before filling the installation, measure the hardness of the
filling and supplementary water.
Treating the filling and supplementary water
Observe all applicable national regulations and technical
rules when treating the filling and supplementary water.
Provided the national regulations and technical rules do not
stipulate more stringent requirements, the following applies:
You must treat the heating water in the following cases
If the entire filling and supplementary water quantity dur-
ing the operating life of the system exceeds three times
the nominal volume of the heating installation, or
If the guideline values listed in the following table are not
met, or
If the pH value of the heating water is less than 6.5 or
more than 8.5.
Total
Water hardness at specific system volume
heating
output
≤ 20 l/kW
ppm
mol/
kW
CaCO₃
< 50
< 300
< 3
> 50
200
2
to ≤ 200
> 200
150
1.5
to ≤ 600
> 600
2
0.02
1) Nominal capacity in litres/heating output; in the case of multi-
boiler systems, the smallest single heating output is to be used.
Caution.
The use of unsuitable heating water may
cause aluminium corrosion and a result-
ing lack of leak-tightness.
In contrast to steel, grey cast iron or copper,
for example, aluminium reacts with alkaline
heating water (pH value > 8.5) to produce
substantial corrosion.
When using aluminium, make sure that
the pH value of the heating water is
between 6.5 and a maximum of 8.5.
Caution.
Risk of material damage if the heating
water is treated with unsuitable additives.
Unsuitable additives may cause changes in
the components, noises in heating mode and
possibly subsequent damage.
Do not use any unsuitable antifreeze and
corrosion inhibitors, biocides or sealants.
16
> 20 l/kW
> 50 l/kW
≤ 50 l/kW
ppm
mol/
ppm
mol/
CaCO₃
CaCO₃
200
2
2
0.02
150
1.5
2
0.02
2
0.02
2
0.02
2
0.02
2
0.02
No incompatibility with our products has been detected to
date with proper use of the following additives.
When using additives, follow the manufacturer's instruc-
tions without exception.
We accept no liability for the compatibility of any additive or
its effectiveness in the rest of the heating system.
Additives for cleaning measures (subsequent
flushing required)
Adey MC3+
Adey MC5
Fernox F3
Sentinel X 300
Sentinel X 400
Additives intended to remain permanently in the
installation
Adey MC1+
Fernox F1
Fernox F2
Sentinel X 100
Sentinel X 200
1)
Additives for frost protection intended to remain
permanently in the installation
Adey MC ZERO
Fernox Antifreeze Alphi 11
Sentinel X 500
If you have used the above-mentioned additives, inform
the end user about the measures that are required.
Inform the end user about the measures required for frost
protection.
7.5
Avoiding danger arising from insufficient
water pressure
The filling pressure must be between 0.10 and 0.15 MPa
(1.0 and 1.5 bar).
If the heating installation extends over several storeys,
higher filling pressures may be required to avoid air entering
the heating installation.
If the water pressure falls below 0.05 MPa (0.5 bar), the
value flashes in the display.
If the water pressure falls below 0.03 MPa (0.3 bar), the
product switches off. The display shows 0.0 MPa (0.0 bar).
Fault F.22 is stored in the fault list.
Top up the water in the heating installation to start up the
product again.
The pressure value flashes in the display until a
pressure of 0.05 MPa (0.5 bar) or higher has been
reached.