C. Procedure
1. Find a suitable installation position of hood
which should be next to a window and can
be cut to let the exhaust duct pass through.
2. If the exhaust duct has to pass through the
wall, particular attention must be paid to the
structure of the wall as steel reinforcement
may be embedded.
3. Mark the location of exhaust outlet hole, the
cut/drill the hole with care.
4. Fix the position of hood and mark the position
of the two hanging hooks.
5. Drive 2 steel nails into the selected wall with
3 mm(maximum)space leave behind for
hanging the hood.
6. Adjust the hanging hooks on both sides of
the hood and hang the hood on the steel
nails, and then adjust the hood from side to
side and from front and back to a horizontal
position.
7. Follow the instruction print on the enclosed
exhaust duct adapter and connect the
exhaust duct adapter to the hood and window
/wall 5-inch or 6-inch duct can be used.
8. Fasten the hanging bracket to the wall by
screws from the fixed holes to avoid of being
hanged up by accident.
9. To ensure drainage performance, hood shall
be installed with slope (2 - 4 mm) as shown
in figure.
Installation Guidelines
Plywood
Keeps the hood in level to avoid
the oil leaking from oil cup.
Drill a hole for the air tube
Drive 2 steel nails in, on the
upper corner of the both side
of the hood.
Adjust the hang hood
and prepare to install
5
Exhaust
duct
3mm(maximum limit)
2-4mm
Screw
Wall
Lever
Tilted