Download Print this page

Advertisement

Quick Links

Greenhouse GM37405 Assembly instructions
www.ttshop.se
MODEL:GM37405
PRODUCT SIZE(LxWxH):320x392x250cm
PLEASE READ CAREFULLY BEFORE ASSEMBLY

Advertisement

loading

Summary of Contents for G-MORE GM37405

  • Page 1 Greenhouse GM37405 Assembly instructions www.ttshop.se MODEL:GM37405 PRODUCT SIZE(LxWxH):320x392x250cm PLEASE READ CAREFULLY BEFORE ASSEMBLY...
  • Page 2: Table Of Contents

    CONTENTS 1. Assembly Advice ..............Page 1 2. Product Features ..............Page 2 - 3 3. Part Lists ................Page 4 - 7 4. Roof Vents Assembly ............Page 8 - 12 6. Doors Assembly ..............Page 13 - 19 7. Base Assembly ..............Page 20 - 21 8.
  • Page 3: Assembly Advice

    Assembly and Maintenance Advice 1. For safety purposes, we strongly recommend that this product is assembled by at least two people. 2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly. 3.
  • Page 4: Product Features

    Functions and Features: 1. Compared with traditional greenhouses, this exciting new product features many significant improvements. The hollow box profile aluminium framing is much stronger than other greenhouses and it can withstand much greater pressure. Wind resistance up to 12th typhoon (40M/S or 120KM/H). Weight Support 80KGS/M2, Snow load capability over 40CM.
  • Page 5 3. Base anchor brackets are included as standard with expanding bolts to ensure a secure fixing into concrete or paving. Alternatively, you can use the brackets to fix into a timber base with wood screws. Expansion Steel bar/Lawn land screw/Concrete ground 4.
  • Page 6: Part Lists

    (ALU. Box No.1) GM37405 PART L01A L01B L01C L08A L08B L26A L26B L26C...
  • Page 7 GM37405 (ALU. Box No.2) PART PART L02A L02B L02D L02E L02F L02G L02H L02I L02K L23A L23B L23C L23D L23E L23F L23N L24A L24B L24C L24D L24E L24F L24G L24H L24I L25A L25B L25C L25D L25E L25F L25G L25H...
  • Page 8 GM37405(ALU.BoxNo.3) PART PART Door L02K M6X12 PART PART L11A L11B L11C L16A Ø4X14 L11D L16B Ø4X14D M8X30 L11E Windowx2pcs L12A L18A Ø4X40 L12B L18B PART L12D L18C L11F L12E L18D L11G L11H L12F L15A L11J L12G L19A Base L12H L19B...
  • Page 9 (PC/GLASS. Box) GM37405 PART PC/Glass...
  • Page 10: Roof Vents Assembly

    PART L11F L11G Roof Vents Assembly 2PCS L15A L19A L19B Ø4X10 Ø4X14D L15A L19A L19A L11G L19B L11F L11F L11G...
  • Page 11 L19A L19A L19B L19A L19B L19A Push down the button on connector J before inserting it into the end of the frame profile. After connector J has been fitted, use the hole in the profile to tighten the connector in place.
  • Page 12 L11G L11F L11F L11G First the glazing panel Y10 should be loosely retained by the bar capping profiles L11F and L11G. Next tap the bar capping gently into position with a rubber mallet.
  • Page 13 Fix the W06 vent handles using Z03 screws.
  • Page 14 L15A L15A Fill the gap with silicone sealant on 4 sides to avoid any leaking.
  • Page 15: Doors Assembly

    PART PART PART L16A L16B Door Assembly M8X30 L18A Ø4X40 L18B L18C L18D L11H L11J...
  • Page 16 Left Door Put L16A into L17 and L18D and put L16B into L18A and L18B, then assemble the door frames using connector J, as shown in the sketches below. L18A&B&D L16A L18D L18D S02x2pcs L16A L16A&B L16A L16B L18B L16A L18A Push down the button on connector J before inserting it...
  • Page 17 L11H L11J L11H L11H L11J L11H First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J. Next tap the bar capping gently into position with a rubber mallet,...
  • Page 18 Slide 2xS02 into L18D, positioned 100mm away from each edge. Secure S02 using M02 bolts, then rotate the wheels to ensure free movement. 100mm 100mm 29mm 29mm After Assembly 14.4mm 14.4mm Attention: make sure you leave 14.4mm space on both ends when you install L13...
  • Page 19 Right Door Put L16A into L17 and L18D and put L16B into L18A and L18C, then assemble the door frames using connector J, as shown in the sketches below. L18A&B&D L16A L18D L18D S02x2pcs L16A L16A&B L16A L16B L18A L16A L18C Push down the button on connector J before inserting it...
  • Page 20 L11H L11J L11H L11H L11J L11H First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J. Next tap the bar capping gently into position with a rubber mallet,...
  • Page 21 Slide 2xS02 into L18D, positioned 100mm away from each edge. Secure S02 using M02 bolts, then rotate the wheels to ensure free movement. 100mm 100mm 29mm 29mm After Assembly * This is the method of adjusting the door height.
  • Page 22: Base Assembly

    Expansion bolt It is essential the dimensions a = b are the same to ensure the base is square. in concrete Steel pegs in soil or wood Support at the corners only is inadequate.
  • Page 23 PART Expansion bolts assembly M8X60 3022mm 106.3 This size is the inner specification of the product, 1536 1536...
  • Page 24: Framework Assembly

    PART L08A L08B First lay out the aluminium profiles, connectors and anchor brackets approximately in place. L08B L08A L08A Make sure you pay close attention to the direction L08B of the pins L08B L08A L08A L08A L08A L08A Assemly L08A, L08B and L10 with connecter A and B. Insert connector A/B into L08A/L08B and L10, tight the bolts with the special spanner (provided) when the connector A/B is in the right position.
  • Page 25 PART L01A L01C L01C L01C L01A L01A Make sure you pay close attention L01C to the direction L01C of the pins L01A L01A Assembly L01A/L01C with connector A/B,insert connector A/B into L01A/L01C, tight the bolts with the special spanner when they are in the right positions.
  • Page 26 PART L01B L01B L01C L01B L01C L01A L01A Make sure you pay close attention to the direction L01B L01B of the pins L01C L01C Install L01B and L06 using connector G/F, insert connector G/F into L01B and L06, tight the bolts with the special spanner when they are in right positions.
  • Page 27 PART L26A L26B L26C L26C L26A L26A L26C L26C L26B L26B L26C Please pay attention to the direction L26C L01C L26A L26A L01C L26C L08A L08B L26B L26C L26C L26B L08A L01C L01C L08A L08B Tap the bar capping L26A into L01C, L26B into L08A, and L26C into L06, L10 and L08B gently with a rubber mallet as shown above.
  • Page 28 PART L23C L24B L24C L24C L24B L24C L24B L23C L23C L01B L01B L01B L01B L24C L24C L24C L24C L24C L24C L24B L24B Tap the bar capping L24C/L24B into L01B gently with a rubber mallet. Make sure you leave 51mm between each two L24C or L24C and L24B in the middle for later assembly. L23C L23C L23C...
  • Page 29 PART L02D L02E L02I L02F L01B L01B L02G L02G L02H L02E L02I L02H L02F L02D L08A Slide in Tight it up L01B L01B L02D&E&F&G*H*I Slide in Tight it up L02D&E&F&G*H*I L23C L23C L08A Put connector K into the slot of L08A and M into the slot of L01B, turn their direction until they go into the holes on L02D/L02E/L02F/L02G/L02H/L02I.
  • Page 30 PART L24D L24E L24F L24G L24I L24H L24I L24G L24E L24H L24F L24D L02H L24I L02F L24G L02D L24E L24H L02I L24F L02G L24D L02E L02D&E&F&G&H&I Tap the bar capping L24D into L02D,L24E into L02E, L24F into L02F, L24G into L02G, L24H into L02H and L24I into L02I gently with a rubber mallet.
  • Page 31 PART L24A L25A L25H L25B L25F L25C L25B L25D L25H L25G L25D L25E L25F L25E L25B L25D L25G L25C L25A L25F L25E L25C L25G L25A L25H L24A L24A L25H L25H L25G L25G L25F L25F L25E L25E L25D L25D L25C L25C L25B L25B L25A...
  • Page 32 PART L02K L02I L02G L02E L02K L02K L02K L02K L01C L02K L02H L02F L02D L01A L23D L02K L23D Tight it up Slide in Put connector K into the slot of L01A,L01C,L02D,L02E,L02F, L02G,L02H and L02I, turn their direction until they go into the holes on L02K.
  • Page 33 PART L23C L23N L23C L23N L23C L23C L23N L23C L23N L23C Tap the bar capping L23C and L23N into L10 and L07 gently with a rubber mallet. Make sure you leave 50mm between the two L23C or between L23C and L23N in the middle, for later assembly of L02A.
  • Page 34 PART L02A L02A L02A L02A L02A L23N&E L23E&N L02A Slide in Tight it up Install L02A (3PCS). Put connector K into the slot of L07 and L10, turn its direction until it goes into the hole on L02A. Tight the bolt in the connector K with the spanner.
  • Page 35 PART L23A L23A L23A L23A L02A L23A Tap the bar capping L23A into L02A gently with a rubber mallet.
  • Page 36 PART L23A L23D L23D L23D L23D L23D L23D L23D L23A L01A L02A L02A L23D L23D L02A L23A L02A L23D L23D 50mm 50mm L23D Tap the bar capping L23A and L23D into L01A and L02A gently with a rubber mallet. Make sure you leave 50mm between the two L23D in the middle,for later assembly of L02K.
  • Page 37 PART L02K L02K L02K L02K L23D L02K L23D Tight it up Slide in Put connector K into the slot of L01A and L02A, turn its direction until it goes into the hole on L02K. Then, tight the bolt in the connector K with the spanner.
  • Page 38 PART L23C L23C L23CX10pcs Tap the bar capping L23C(10PCS) into L06 and L07 gently with a rubber mallet. Make sure you leave 50mm between the two L23C in the middle,for later assembly of L02B.
  • Page 39 L02B L02B L02B L02B L02B L02B L23C L23C L02B L23C Tight it up Slide in Install L02B (4PCS). Put connector K into the slot of L06 and L07, turn its direction until it goes into the hole on L02B. Then tight the bolt in the connector K with the spanner.
  • Page 40 PART L23B L23B L23B L23B L23B L02B L23B Tap the bar capping L23B into L02B gently with a rubber mallet.
  • Page 41 PART L23E L23E L23E L23F L23F L23E L23F L23E L23E L23E L23E L23E L02A L23E&F 50mm 50mm L23E L02B L23E L01B L23E L23F L23E L23F L23E L23E L23E L23E L01B L23E Tap the bar capping L23E and L23F into L01B L02B L01B L01B and L02B gently with a rubber mallet.
  • Page 42 PART L02K L02K L02K L02K L02K L02K Slide in Tight it up L02K L02E&F L23E Assembly L02K. Put connector K into the slot of L01B and L02B, turn its direction until it goes into the hole on L02K. Then tight the bolt in the connector K with the spanner.
  • Page 43 PART L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L02K L23C Tap the bar capping L23C into the corresponding aluminium profiles gently with a rubber mallet as shown above.
  • Page 44 PART L02K L02K L02K Slide in Tight it up L02K L02B L23F Assembly L02K. Put connector K into the slot of L02B, turn its direction until it goes into the hole on L02K. Then tight the bolt in the connector K with the spanner. Make sure L02K must connect to L23F closely.
  • Page 45 PART L23C L23C L23C L02K L23C Tap the bar capping L23C into L02K gently with a rubber mallet. L02K L23C Attention: If you install automatic openers, please cut L23C into 2pcs (Length: 338MM/PC) Tap them into L02K gently with the a rubber mallet, and leave 42mm space for W10.
  • Page 46: Panels Assembly

    PART Panel Assembly L11A L11B L11C L11D L12D L12F L12H L11B L12K L12K L12K L12K L12K L11C L12H L12F L12D L11A L11D L11D L11D L11D 16 17 Install the panels and aluminum bar capping in order as shown above, tap these bar capping into the channels of each position properly with a rubber hammer.
  • Page 47 PART L11A L11B L11C L11D L12E L12G L11B L12I L12K L12K L12K L12K L12K L11C L12I L12G L12E L11A L11D L11D L11D L11D Install the panels and aluminum bar capping in order as shown above, tap these bar capping into the channels of each position properly with a rubber hammer.
  • Page 48 PART L11A L11D L11E L12A L12K L11A L12A L12A L11A L12K L12K L12K L11D L11E L11E L12A L11A L12A L11A L12K L12K L12K L11D L11E L11E Install the panels and aluminum bar capping in order as shown above, tap these bar capping into the channels of each position properly with a rubber hammer.
  • Page 49 PART L12B L12B L11B L12B L12B L12K L11B L12K L12K L11B L12K L12B L12K L12K L12K L12K Install the roof panels and aluminum bar capping in order as shown above, tap these bar capping into the channels of each position properly with a rubber hammer.
  • Page 50 Fill the silicone sealant on the places shown above to avoid any water leaking.
  • Page 51 PART Windowx2pcs Ø4X14D M6X12 L15A L15A *Ensure the manual vent is closed as shown. Z02x2 Slide the window vent along Use a screw S01 to pass over Part Z,and then put part Z (2pcs) the groove in the L06 and fix into the slot of L07, turn its direction until it can fix W08.
  • Page 52 PART Use a bolt S01 to pass over W12, and then slide W12 (2pcs) into the channel of L14, M6X12 fix them using W13 and M03 loosely. L18D Right Door Left Door S02X3pcs Door Rotate D, the roller wheels, to adjust the height of the door so it does not bind or rub on the bottom track.
  • Page 53 PART J02R/L J03R/L Ø4X14D Install the anchor brackets J03R/L and J02R/L using screw Z02. J03R/L J02R/L...
  • Page 54 PART Ø4X14 L01B J02R/L Drill a hole in L01A and L01B, Fill some silicone sealant Fill some silicone sealant approximately 3.2mm diameter around the downpipe bends around J02, J07 and J06 and 700mm up from the bottom. to avoid water leaking. to avoid water leaking.