Download Print this page

Baudcom BD-ONT-112HW-AC Quick Installation Manual page 4

2lan+wifi dual band dual mode onu

Advertisement

4
2. Packing List
Contents
Dual Mode ONU
Installation Guide
3. Certification
4. Hardware Installation
Installation Environment Requirements
ONU equipment must be installed in the interior
 Confirmation at the ONU installation at sufficient space to facilitate cooling machine.
 ONU suitable operating temperature of -5 ℃ ~ 55 ℃, humidity 10% to 90%.
 Device workplace should avoid radio transmitters, radar stations, and high-frequency
interference from power equipment.
Equipment Installation
1. Installed on the desktop
Place the ONU on a clean bench, this installation is relatively simple, you can observe the
following operation:
 Ensure the smooth workbench.
 Around the device enough space for heat dissipation.
 Do not place objects on the device.
2. Mounted on the wall
 Observation ONU equipment chassis two cruciform recess, in accordance with the
position of the groove, installed two screws in the wall.
 The original selected two mounting screws gently snap into recesses aligned.
 Slowly let go, so that the device under the support of the screw hanging on the wall.
3. Connect fiber, network cable and power adapter to the corresponding interfaces, and turn
on the power of product.
Website : www.baudcom.com.cn Tel: +86 21 37709251 Email:
2LAN+WiFi(dual band) Dual Mode ONU Quick Installation Guide_V1.1
Quantity
1 pcs
Power adapter
1 pcs
Network cable
, and to ensure
Contents
the following conditions:
info@baudcom.com.cn
Quantity
1 pcs
1 pcs
Skyper: robert.luo905

Advertisement

loading