Download Print this page

S-Tech SWP-2FT-12CM User Manual page 2

Solar led batten light

Advertisement

Fix the two metal clips into posi•on and a•ach to surface. It is recommended that each clip is posi•oned
approximately 20CM from each end of the Ba•en Light. Cau•on : Ensure correct anchor sleeves are used for
surface material. Plese see package contents before installa•on.
Insert Tensioning Bolt and a•ach the
Ba•en Light to the metal clips.
Connect the MC4 Connectors to the Solar
PV panel. Note : A matching pair of MC4
connectors are included in the contents of
this package. If the Solar PV Panel does
NOT have an iden•cal pair of MC4
connectors, replace them with the ones
provided to guarantee a weather •ght
connec•on.
20CM
Using a screw driver, secure each clip onto the Ba•en
Light with the Tensioning bolt.
Note : This is only to secure the ba•en light so it cannot
be removed - Do not over •ghten.
Power ON the Ba•en Light. Program the light to best
suit your installa•on.
manual properly.
Factory Default Setting:
No movement (standby): 30% brightness
Movement: 100% brightness
After no movement for 30 seconds, the light will dim back to 30%
standby brightness until movement detected again.
1
Please refer to setup guide of

Advertisement

loading