Page 1
J - (2) a with large djusTmenT and n asHer ASSEMBLY Set up Wooly Board to desired sweater size prior to washing sweater and note location of C “C” which connects a “B” neCTing to p “D”. Place the (2) B “E”...
Page 2
“a”, with sweater, off the Posts, and draw the T out of the sweater. Note: T o move or carry assembled w , pick it up by the 2 p below the a ooly oard osTs eams 0704 LACIS, , Ca 94703 erkeley...