Download Print this page
Lacis WOOLY BOARD Manual

Lacis WOOLY BOARD Manual

Advertisement

Quick Links

See Detail '1'
PARTS
A - (2) T
B
op
eams
B - (2) a
B
rm
eams
C - (2) C
onneCTing
D - (2) p
osTs
E - (2) B
B
ase
ars
F - (1) B
s
ase
upporT
G - (2) n
B
eCk
ars
H - H
p
olding
ins
I - (3) k
s
noB
eTs
s
Crews
J - (2) a
a
rm
djusTmenT
w
asHer

ASSEMBLY

Set up Wooly Board to desired sweater size prior
to washing sweater and note location of C
p
"C" which connects a
neCTing
in
to p
"D".
osT
1.
Place the (2) B
side to flat side, with the large holes facing up.
Secure together with the s
"I" placed through the slots, spreading the bars so
the large end holes are a bit less than the sweater
width. Locate k
noB
the holes and tighten.
Note: Knob Sets "I" should be hand tightened and
J
(1 Right and 1 Left) with
p
ins
with
(1 with Short s
Crew
, w
and threaded k
asHer
p
with large
ins
and n
uT
B
rm
B
"E" together, flat
ase
ars
s
k
HorT
Crew
s
so it is centered between
eT
LF67
WOOLY BOARD
A hardwood fully adjustable frame for blocking
sweaters. Independent adjustment for waist, shoul-
der, arms and neck. Waist: 12"- 62"; Shoulder:
24" - 62"; Arm: 19"- 25" x 4"- 24" rnd. All hard-
ware stainless steel.
See Detail '2'
B
D
a
F
ssemBled
rame
, 2
l
wiTH
ong
)
noB
C
I
-
on
"B"
eam
s
noB
eT
H
H
ardware
the
L
acis
A
H
I
C
E
F
I
J
nuT
wasHer
J
G
A
A
B
d
'1'
eTail

Advertisement

loading

Summary of Contents for Lacis WOOLY BOARD

  • Page 1 J - (2) a with large djusTmenT and n asHer ASSEMBLY Set up Wooly Board to desired sweater size prior to washing sweater and note location of C “C” which connects a “B” neCTing to p “D”. Place the (2) B “E”...
  • Page 2 “a”, with sweater, off the Posts, and draw the T out of the sweater. Note: T o move or carry assembled w , pick it up by the 2 p below the a ooly oard osTs eams 0704 LACIS, , Ca 94703 erkeley...