Electrical Work - Mitsubishi Electric Mr.Slim PUZ-ZM YKA Series Installation Manual

Hide thumbs Also See for Mr.Slim PUZ-ZM YKA Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3

6. Electrical work

6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
B
L N
S1
S2
S3
D
For Power
For Power
en
12
S1
A
S2
S3
A Indoor unit
B Outdoor unit
C Remote controller
C
D Main switch (Breaker)
E Earth
D
B
A
A
E
C
E
Fig. 6-1
ZM200, 250
M200, 250
A
F Terminal block
E
G Indoor/Outdoor connection terminal block (S1, S2, S3)
H Service panel
I Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
J Earth terminal
Note :
If the protective sheet for the electrical box is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line. Without N-Line, it could cause damage to unit.
ZM200, 250Y
M200, 250Y
Fig. 6-2
L1 L2 L3 N
S1 S2 S3

Advertisement

Table of Contents
loading

Table of Contents