Page 1
Assembly and operating instructions Rothewald®hydraulic motorcycle hoist, order no. 10059174 Anwendungsbeispiel Please read these assembly and operating instructions BEFORE unpacking the hydraulic hoist from the wooden crate and assembling it!
Page 2
Assembly and operating instructions Rothewald®hydraulic motorcycle hoist, order no. 10059174 We would like to congratulate you on purchasing hoisting platform from the wooden crate, for com- the hydraulic motorcycle hoist for two-wheelers by pleting the assembly and putting it into operation.
Page 3
If required, attach the front wheel clamp to the 4. Use of the hoisting platform working platform with the enclosed M10x25 bolts, Before placing a vehicle on the hoisting platform, washers and nuts (adjustable, depending on the make sure that the motorcycle hoist is positioned vehicle length).
Page 4
The front wheel clamp is not sufficient to retain While working on the vehicle, the loading ramp the vehicle on the hoisting platform and to keep it must be removed, in order to avoid a risk of in an upright position – a centre stand or a motor- injury.
Page 5
Do not assemble the loading ramp until now, in • While working on the vehicle, the loading ramp order to prevent it from jamming on the ground must be removed and not re-attached, until the when lowering the hoisting platform – platform is completely lowered –...
Page 6
by an authorised service centre. • Check the oil level on a regularly by removing the base plate when the hoist is completely lowered and opening the air-vent screw on the hydraulic cylinder. The oil level should be slightly (approx. 6.5mm) below the filling hole. If necessary, the oil level can be refilled with quality hydraulic oil ISO VG 15, e.g.
Need help?
Do you have a question about the 10059174 and is the answer not in the manual?
Questions and answers