  • Page 1 CG 25 S OPERATING INTRUCTIONS...
  • Page 2: Ec Declaration Of Conformity

    Declaration of conformity The undersigned manufacturer: SAINT-GOBAIN ABRASIVES S.A. 190, Bd J.F. KENNEDY L- 4930 BASCHARAGE Declares that this product: CG 25 S 70184626882 Grinding machine: Codes: 70184629465 is in conformity with the following Directives: • European Machinery Directive 2006/42/EC •...
  • Page 3: Table Of Contents

    Table of Contents EC Declaration of Conformity 1. Introduction 2. Machine description Application Accessory’s 3. Safety Safety precaution Safety regulations Safety instructions 4. Initial operation Checkpoints of electrical safety Checkpoints of machine safety Removing the diamond disc Fixing the diamond disc 5.
  • Page 4: Introduction

    The rotating parts are covered by a sliding protecting cap with a connection for a dust hose. With a suitable Clipper dust collector you can work without causing dust. The machine can be levelled by turning the height adjustment handle.
  • Page 5: Safety

    3. Safety Before operating the machine, the personnel must be familiar with the safety instructions given in this manual. Keep this manual near to the machine, so it can always be consulted. Safety precaution The surface to be treated must be swept clean to remove stones, screws etc. Never use the machine when the surface is not clear and if there is a risk of tripping.
  • Page 6: Safety Instructions

    The following sticker is placed on the machine. Meanings of these symbols are: Ear protection is obliged. Safety glasses with lateral protection are obliged. CE-mark on this machine Safety shoes obliged Consult the manual before operating the machine. Personnel must tie back long hair and not wear loose clothing or jewellery including rings. Wear gloves and dust mask during operating the machine.
  • Page 7: Initial Operation

    4. Initial operation Before using the machine it is committed to inspect the machine. It is not permitted to use the machine if the machine safety is not according the checkpoints below. Checkpoints of electrical safety Use only extension cables for extending the main cable that are sized and marked in accordance with the overall power consumption of the machine.
  • Page 8: Operating

    5. Operating During operating the CG 25 S the following additional safety instructions must be followed closely. Switch on the machine Level the machine with the height adjustment handle Turn on the dust collector before switching on the machine. Connect the power cable to the machine Stand behind the machine Push down on the handle of the machine so that the diamond disc is off of the ground, but the protection cap...
  • Page 9: Maintenance

    Any guarantee on the machine is expired when: Non original Norton and Clipper parts and diamond discs have been used. Repair work is not done by qualified Saint-Gobain Abrasives personnel Changes, add on’s or conversions are undertaken without written permission of Saint-Gobain...
  • Page 10: Technical Data

    80dB(A) Dust hose 51 mm Ø 51 mm Ø connection Suitable filter unit Contact Clipper Contact Clipper we will assist you we will assist you with a good advice. with a good advice. Design and specifications are subject to change without notice by Saint-Gobain Abrasives.
  • Page 11 Guarantee can be claimed and technical support obtained from your local distributor where machines, spare parts and consumables can be ordered as well: Benelux and France: United Kingdom From Saint-Gobain Abrasives Saint-Gobain Abrasives Ltd. in the Grand-Duché de Luxembourg Doxey Road Free telephone numbers: Stafford Belgium : 0 800 18951...
  • Page 12 SAINT-GOBAIN ABRASIVES 190, Bd John F. Kennedy L-4930 BASCHARAGE LUXEMBOURG Tel.: ++352 50 401-1 Fax: ++352 50 16 33 e-mail: sales.nlx@saint-gobain.com www.construction.norton.eu 05.08.2009...