Commissioning After Taking Out Of Operation - ABB TPS44 Series Operation Manual

Hide thumbs Also See for TPS44 Series:
Table of Contents

Advertisement

Operation Manual / TPS44-F.. - TPS61-F..
3 Start-up / 3.3 Commissioning after taking out of operation

3.3 Commissioning after taking out of operation

If provided
© Copyright 2020 . All rights reserved.
Remove cover plates (blind flanges) between compressor casing out-
u
let and charge air duct, before gas inlet and after gas outlet.
Inspect exhaust gas duct / line in front of and after turbine for any
u
combustion deposits, foreign matter or residual water. Clean and re-
move.
Inspect air supply line or filter silencer for any foreign matter. Clean
u
and remove.
Start up turbocharger oil circulation system at engine end.
u
Prepare turbocharger for operation as instructed in section "Inspec-
u
tion work before start-up / commissioning" of chapter headed "Start-
up / commissioning".
Start up turbocharger.
u
HZTL2412_EN
Rev.G
March 2020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents