K&A MANUFACTURING
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
VERSION DATED: 8/15/11
READ ALL THE INSTRUCTIONS BEFORE BEGINNING
PAPER STRIPS
COVERING
GLUE DOTS
ITEM # PART #
1
50093 16" TRACK ASSY
2
51708 M5 x 18mm SQ/PH/WSHR HEAD WOOD SCREW
3
200CPU ECONOMY CPU HOLDER
4
52679 8-32 x 3/8 PHILLIPS TRUSS HEAD MACHINE SCREW
5
50330 #20/3 WIRE PULL HANDLE
6
50232 FRONT STOP
7
50200 10-24 x 1/2 SELF TAPPING MACHINE SCREW
INSTRUCTION # 50576
TOOLS REQUIRED FOR ASSEMBLY:
CORDLESS DRILL
#2 PHILLIPS DRIVER BIT OR
#2 SQUARE HEAD DRIVER BIT
TAPE MEASURE
SQUARE
1
PLACE THE TRACK SQUARE
WITH THE FRONT OF THE
WORKSURFACE AND BACK 3/8"
STEP 3
DESCRIPTION
HARDWARE PACK # 50519
200CPU HOLDER INSTALLATION INSTRUCTIONS:
STEP 1: DETERMINE THE LOCATION TO MOUNT THE CPU HOLDER ALLOWING
FOR THE HEIGHT, WIDTH, & DEPTH OF YOUR CPU. MAKE SURE THE CPU HAS
ENOUGH CLEARANCE TO ROTATE LEFT & RIGHT AS FAR AS YOU WANT IT TO
ROTATE.
STEP 2: REMOVE THE CPU HOLDER FROM THE TRACK
TOWARD THE FRONT AND SET IT ASIDE.
STEP 3:
EXPOSE THE GLUE DOTS ON THE TOP OF THE TRACK 1 BY PULLING
THE PAPER STRIPS OFF THE TRACK. POSITION THE TRACK IN THE LOCATION
SHOWN AND PRESS IT FIRMLY IN PLACE SO THE GLUE DOTS WILL HOLD THE
TRACK TO THE BOTTOM OF THE WORKSURFACE.
IMPORTANT NOTE: THE WORKSURFACE MATERIAL MUST BE COMPATIBLE WITH
THE SCREWS PROVIDED. THE WORKSURFACE MUST BE AT LEAST 1" THICK.
STEP 4: ATTACH THE TRACK 1
SCREWS
2
. DO NOT OVER-TIGHTEN THE SCREWS. USE A LOW TORQUE
SETTING ON THE DRILL.
QTY.
1
4
1
2
1
1
2
1
BY SLIDING IT OUT
TO THE WORKSURFACE WITH (4) WOOD
1
2
BOTTOM OF WORKSURFACE
STEP 4
PAGE 1 OF 3
Need help?
Do you have a question about the 200CPU and is the answer not in the manual?
Questions and answers