Page 1
VERSAMAX™ PHENOLIC LOCKER INSTALLATION INSTRUCTIONS General Instructions 1. Check material received against the packing list. Check the number of packages received and then check the contents of each package. 2. Check the material received for damage. If damage has occurred, secure a “damage notation”...
8. Toe Kick Installation Proceed to step 9 if the project does not include a Toe Kick. The toe kick strips attach to the locker legs using the supplied mounting plate and clip. Locate the toe kick strips and align them under the lockers in the positions they belong.
Need help?
Do you have a question about the VERSAMAX and is the answer not in the manual?
Questions and answers