Trane YCZ035F1 Installation Operation & Maintenance page 6

Single package two stage gas/electric 16 seer convertible 3, 4, 5 ton
Table of Contents

Advertisement

5
NOTE
SUPPLY OPENING
1. REMOVE SCREW NEAREST TO THE
OPENING AND PULL THE PANEL FIRMLY
TOWARD THE OUTSIDE OF THE UNIT TO
DISENGAGE THE BACK ATTACHMENT.
RETURN OPENING
2. REMOVE RIGHT HAND SCREW AND
MOVE PANEL TO THE RIGHT OR RE-
MOVE BOTH SCREWS.
6
SIDE RAIL
WOOD NAILER
SERVICE CLEARANCE & PENETRATION DIMENSIONS
MODEL NO.
A
B
YCZ036F
30" 30" *12" 30"
YCZ050F
42" 30" *12" 36"
YCZ060F
* 18" WITH FRESH AIR ACCESSORY
* 30" WITH ECONOMIZER
Page 6
CONVERTING HORIZONTAL TO DOWNFLOW
HORIZONTAL SUPPLY
AIR COVER
REQUIRED CLEARANCE FOR UNIT INSTALLATION
AND ROOF PENETRATION HOLE SIZE REQUIRED
D
SERVICE
CLEARANCE
LINES
C
D
E
F
44"
25"
50"
25"
HEATER EXCHANGER
TUBES
SHEET METAL
SCREWS
SUPPLY AIR
C
RETURN AIR
HOLE IN ROOF
E
HORIZONTAL RETURN
AIR COVER
A
B
F
SERVICE
CLEARANCE
LINES

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents