FIORENTINI SP500 NEW Operating Instructions Manual

Walk-behind sweeper

Advertisement

Quick Links

ING. O. FIORENTINI S.p.A.
INDUSTRIAL CLEANING MACHINES
WALK-BEHIND SWEEPER
MOD. SP500 NEW
OPERATING INSTRUCTIONS
AND MAINTENANCE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP500 NEW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FIORENTINI SP500 NEW

  • Page 1 ING. O. FIORENTINI S.p.A. INDUSTRIAL CLEANING MACHINES WALK-BEHIND SWEEPER MOD. SP500 NEW OPERATING INSTRUCTIONS AND MAINTENANCE...
  • Page 2: Table Of Contents

    Congratulations for your choice! FIORENTINI S.p.A.. thanking you for the preference to our product, would like to remind you that FIORENTINI’s S.p.A. production covers manufacture and marketing of industrial cleaning machines and is currently a Leading industry in this sector .
  • Page 3 4.8 Functioning………………………………………………………………………………… 4.8.1. Leverage functions ……………………………………………………………………… 4.8.2. Central brush replacement ………………………………………………………….. 4.8.3. Side brush replacement……………………………………………………………….. 4.8.4. Recovery tank emptying..…………………………………………………………….. 4.8.5. Motor maintenance..…………………………………………………………….. 4.8.6. Filter shaker motor maintenance…………………………………………………….. MANUTENZIONE 5.1. Maintenance schedule…………..……………....…..…..…………... 5.2. Battery maintenance……………………………………………………………………….. 5.2.1. Hydrometry………………………………………………………………………………… 5.2.2. Water Filling Up………………………………………………………………………... 5.2.3.
  • Page 4: General Information

    We remind to put it in a safe place and keep it for all the machine lifetime. Purchaser is responsible to show it to qualified people. In case of loss ask for a duplicate to FIORENTINI Co.
  • Page 5 GENERAL INFORMATION SP 500 NEW  Non-respect of instructions included in this manual;  Breaking and/or changes made up without FIORENTINI’s approval;  Not-use of genuine wear parts;  Interventions made up by unauthorized personnel;  Maintenance missing;  Natural calamities.
  • Page 6: Conformity Declaration

    FIORENTINI. Repairing or substituting works under warranty will be, by FIORENTINI’s opinion, made in its own workshop, or by third party on place. Works on place, are supplied with customer’s energy sources and exceptional equipment to repairing if necessary.
  • Page 7 GENERAL INFORMATION SP 500 NEW 28/04/09 Rev. 00 Pag. 7/31...
  • Page 8: Support Features And Specifications

    DESCRIPTION AND COMPONENTS The sweeper machine SP500 NEW has been designed for treatment of flat areas by a sweeping process that put the dust in a recovery tank in the back of the machine. The power is supplied by a battery accumulator or by a petrol engine, which feed all motors and electric controls.
  • Page 9  1 castor wheel FIORENTINI Co., taking care of new safety rules in CE community , has manufactured the machine following safety and health rules of the CE normative. High quality material used, high technology and Fiorentini experience allowed to have performing machine .
  • Page 10: Specifications

    BATTERY WEIGHT 13.4 kg The above characteristics are not a must for the manufacturer so they can be changed without any notice .In any case ING.O.FIORENTINI Co. Is always at disposal for any information ( 7.1.). MEASUREMENT UNITS CONVERSION 1 inch = 1” = 25,4 mm...
  • Page 11: Correct Use

    In order to use in a better way the machine characteristics it is suggested to use the original parts and spare parts studied by Fiorentini Co.. In any case the Technical department is at customers disposal in order to satisfy any needs .
  • Page 12: Operators Qualification

    We recommend to teach the personnel the correct use of the machine, especially for what concerns safety aspects ; particularly operators must read and understand this manual. FIORENTINI decline every responsibility for accidents to persons or things from using the machine by non-authorized or unqualified operators.
  • Page 13: Safety Devices

    IMAGE 3.6 RESIDUAL DANGERS La FIORENTINI ha analizzato tutti i pericoli correlati all’uso della macchina allo scopo di eliminare, o perlomeno ridurre, il rischio di infortunio per gli operatori, fin dalla fase progettuale. Per ridurre il rischio associato ai pericoli residui si è provveduto informando gli operatori mediante segnaletica e indicando i mezzi e le procedure antinfortunistiche da adottare.
  • Page 14: Safety Signals

    Don’t use the machine to clean up areas exceeding 8% slope or presenting holes and depressions, which might compromise the stability of the machine. FIORENTINI decline every responsibility for accidents to persons or things using the machine on surfaces that can compromise the stability of the same one. The operator has to follow recommendations about areas conditions on which he has to work.
  • Page 15 SAFETY SP 500 NEW This signal indicate the risk of explosion due to hydrogenous exhaled What is it ? during the battery charge (battery version). During the batteries charge make sure that the machine is under a What to do ? vacuum chimney or in a ventilated area.
  • Page 16: Instructions For Starting And Use

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW INSTRUCTIONS FOR STARTING AND USE 4.1. TRANSPORT AND HANDLING This sweeper is delivered to the purchaser in a special package, which features are well showed in picture 4.1, completely assembled. The package shows the barycentre position indicated with a black arrow. The forks of the truck or transpallet must be placed in such a way as the black arrow is at the center of them.
  • Page 17: Storage

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW Bands to be used must be suitable for the effective loading. Operations must be executed slowly avoiding oscillations or upsetting. The incorrect way of operating can damage the support or expose to dangers. Machine dimensions and mass are explained at point 2.3.
  • Page 18: Installation

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW 4.5. INSTALLATION The installation must be done by authorized personnel after reading this manual. 4.5.1 BATTERY INSTALLATION Follow the below instructions to install the batteries:  the battery box is under the protection cover (detail 1 image 4.5.1);...
  • Page 19: Regulations

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW REGULATIONS 4.6.1 REGULATION OF THE HANDLE Turn the knobs at the base of the handle in order to set it according to the operator’s needs. When loosen, it is possible to change the handle height. Strengthen the knows again to fix the handle position.
  • Page 20: Control Devices

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW 4.7. CONTROL DEVICES 4.7.1. CONTROL BOARD The control board is composed by some switches which control the main functions of the machine. Here below there is the scheme that resumes all control board main functions ( image. N° 4.7.1). IMAGE N°...
  • Page 21: Functioning

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW 4.8. FUNCTIONING Sweeping is made by few and simple operations. After having switched on the machine, put the two brushes (central and side brush) to their working position. Then activate the vacuum motor in order to collect all the dust in the proper recovery tank. The brushes start rotating only when the forwarding lever is activated: proceed at constant speed on the surface to be cleaned.
  • Page 22: Central Brush Replacement

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW 4.8.2 CENTRAL BRUSH REPLACEMENT To replace the main roller brush follow all below instructions:  Turn the machine off.  Remove the screws fixing the main brush (detail 1 image 4.8.2)  Turn the machine on one side ...
  • Page 23: Recovery Tank Emptying

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW 4.8.4 WASTE TANK EMPTYING The operator has to follow the below instructions in order to empty the waste tank:  Remove the key from the control board in order to avoid an accidental starting. ...
  • Page 24: Filter Shaker Motor Maintenance

    INSTRUCTIONS FOR STARTING AND USE SP 500 NEW 4.8.6 MAINTENANCE OF FILTER SHAKER MOTOR The filter shaker motor removes the dust from the filter during the working phase, in order to keep the filter always efficient. The filter shaker motor is activated by the switch on the control board. The removed dust falls in the proper recovery tank.
  • Page 25: Maintenance Schedule

     Authorized personnel only can service this machine, particularly for electrical and electromechanical parts using suitable tools and equipment for every intervention.  For assistance and spare parts address exclusively to Fiorentini S.r.l. (point7.1. / 7.2.). OPERATION WHAT TO DO...
  • Page 26: Hydrometry

    MAINTENANCE SP 500 NEW 5.2.1 HYDROMETRY In order to check the batteries hydrometry the operator has to follow the instructions below:  By means of a hydrometre draw a small quantity of electrolyte so that the floater reaches the surface; ...
  • Page 27: Electrical Equipment Checking

    All intervention on the electrical system must be done by a technician. All maintenance or repair out of the ordinary maintenance must be done with personnel authorized only by FIORENTINI. 5.4 TESTS TO BE CARRIED OUT FREQUENCY...
  • Page 28: Maintenance Register

    MAINTENANCE SP 500 NEW MAINTENANCE REGISTER DATE OPERATOR TIPOLOGY / NOTE SIGNATURE Rev. 00 28/04/09 Pag. 28/31...
  • Page 29: Technical Assistence

    6.2 VERBAL CLAIM Fiorentini S.p.A, has a big consideration of customer needs, that’s why we think we can always get precious information to improve our products, placing at customer’s disposal a statement to point out possible defects using our sweeper SP500NEW.
  • Page 30 Electrical system failure  Engine failure  Missing component  Excessive noiseness  Water leakage  Other Customer’s notes : Please point out notes and/or suggestions on products / services of Ing. O. Fiorentini S.p.A. 28/04/09 Rev. 00 Pag. 30/31...
  • Page 31 Nr. de serie Data di spedizione Date of shipment _____________________ Date de spedition Distributed by: ING. O. FIORENTINI S.p.A. “T ” HE BEST IN FLOOR MACHINES FILIALI: 20132 MILANO – Fax. 02/2592779 Via Palmanova 211/a – Tel. 02/27207783 - 2564810 00012 Guidonia Montecelio (ROMA) –...

Table of Contents