Installation - Dell PowerEdge FN Getting Started Manual

Hide thumbs Also See for PowerEdge FN:
Table of Contents

Advertisement

Installation

This switch installation procedure assumes that the Dell PowerEdge FX2 server chassis is installed
correctly. For complete installation instructions, refer to the Dell PowerEdge FX2 server chassis
Installation Guide.
AC/DC power cord — The cord reaches from the power outlet to the Utility-panel connector.
Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters,
broadcast amplifiers, power lines, and fluorescent lighting fixtures.
Airflow — The airflow around the switch and through the vents is unrestricted.
Unpacking the FN I/O Module
When unpacking the FN I/O Module, ensure that the following items are included:
One FN I/O Module
One USB type A-to-DB-9 female cable
Getting Started Guide
Safety and Regulatory Information
Warranty and Support Information
Software License Agreement
Unpacking Steps
NOTE: Before unpacking the FN I/O Module, inspect the container and immediately report any
evidence of damage.
1.
Place the container on a clean, flat surface and cut all straps securing the container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure and clean surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.
8
4
Installation

Advertisement

Table of Contents
loading

Table of Contents