INSTALLATION DETAILS
1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLATION OF UNIT
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
4. BACKFILL FOUNDATIONS WITH
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED
THIS PRODUCT CONFORMS WITH BS EN1176- :2008
Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858
0.062
CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
1
& BS EN1176- 3 :2008
http://www.fawns.co.uk mail:fawns@fawns.co.uk
No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2014
TECHNICAL DATA
MINIMUM SPACE REQUIRED
SUPERVISED PLAY
EQUIPMENT TYPE
LARGEST PART
HEAVIEST PART
6.10M X 6.70M
RECOMMENDED
LOW LEVEL
2100MM X 125MM DIA
15.5KG
Version: A
Date:
01/06/16
PAGE
1
OF
4

Advertisement

loading

Summary of Contents for FAWNS Playtime PICUS

  • Page 1 Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858 http://www.fawns.co.uk mail:fawns@fawns.co.uk Version: A No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2014 Date: 01/06/16...
  • Page 2 849.3 1348.6 1447.8 1029.1 801.3 1537.9 801.3 1585.1 1249.6 1537.9 1137.9 1258.3 1586.1 867.4 900 X 350 X 250 DEEP 1051 1567 ALL FOUNDATIONS 350 X 350 X 600 DEEP UNLESS OTHERWISE SPECIFIED PAGE...
  • Page 3 6085 1272 841.5 987.0 1035.5 839.6 910.3 1052.2 1067.5 953.1 1050.2 1211.3 1111 1528 1107 22.5 SQ METRES WETPOUR SURFACING 18.5 LINEAR METRES WETPOUR EDGING PAGE...
  • Page 4 5500 1292.7 1178.0 1165.5 1775.6 1452.2 22 GRASS SAVER TILES (1.5M X 1.0M) PAGE...
  • Page 5 Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858 http://www.fawns.co.uk Email:fawns@fawns.co.uk No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2014 PAGE...
  • Page 6 Excavate the foundation hole in accordance to each products individual specification sheet. Each steel ground shoe is supplied pre-attached to the unit post. Position the post into the foundation hole to the required depth. NOTE: As illustrated, it's essential a distance of 50mm is maintained from the finished surface level to the underside of the timber post.
  • Page 7 Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858 http://www.fawns.co.uk Email:fawns@fawns.co.uk No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2013 PAGE...
  • Page 8 BUILD TRIANGLE PLATFORM WITH SLIDE Excavate the foundations as detailed using sheet PICUS3-SPEC. Using posts labelled 'O' loosely secure to the upright posts labelled 'A' using the supplied Washer Screws to the dimensions detailed below. Pay strict attention to the direction of the counterbore holes on posts 'A' as these will have to be facing the correct direction for the rope attachment detailed later on in this installation guide.
  • Page 9 Secure the HDPE slide frame to the front of the deck and the upright posts as illustrated in Detail View C. Ensure there are no gaps between the posts and the HDPE slide frame, any gaps can be eliminated by maneuvering the posts labelled 'A' and the triangle deck.
  • Page 10 POST ASSEMBLY & INSTALLATION The Upright posts on this unit should all be leaning at a 10 angle away from the deck structure. The posts should all be drilled and of the correct size to achieve this angle. Ensure all bolts and screws are loosely fitted to give enough movement for ropes and timbers to have the appropriate tensioning.
  • Page 11 Prop post labelled 'K' into the foundation hole. Loosely secure post 'G' to posts 'J' & 'K' using the supplied Coach Screws. Ensure the horizontal log is positioned on the deck side of the two upright posts. Attach post 'B' to the pre-driled hole under post 'G' onto post 'K' The other side of post 'B' is secured to the triangle deck post using a Coach Screw (as positioned below).
  • Page 12 Prop posts labelled 'E' & 'F' into the foundation hole. Loosely secure post 'K' & 'M' to posts 'E' & 'F' using the supplied Coach Bolts. Attach the other ends of posts 'K' & 'M' to the triangle deck frame with the supplied Coach Screws as illustrated. SECURE USING M12 X 220 COACH BOLTS SECURE USING...
  • Page 13 Secure the end of post labelled 'K' to the pre-drilled hole in upright post 'E' using the supplied Coach Bolt. This should give post 'K' the correct angle to sit on already connected posts and secure with 2 x Coach Screws. Add the additional logs 'M' &...
  • Page 14 Secure the remaining posts to the unit to the dimensions given below using the supplied M10 x 120 Coach Screws. Dimensions are measured along the width of the timber horizontal. ATTACH THE ROPES Finally, with the structure complete the ropes can be secured to the correct upright posts.