ACTION & IMAGINATION
PICK UP STICKS 8
PROD. CODE
PICUS8
L: 5.9M W: 7.8M H: 2.4M
SIZE
FFH
1800MM
AGE RANGE
7+ YEARS OLD
INSTALLATION DETAILS
1. READ INSTALLATION INSTRUCTIONS THROUGHLY BEFORE COMMENCING INSTALLTION OF UNIT
2. EXCAVATE FOUNDATIONS USING THE DETAIL AS SHOWN ON PAGE 2 OF THIS DOCUMENT
3. ENSURE TO CHECK AND TIGHTEN ALL FIXINGS USING PROTECTIVE CAPS WHERE NECESSARY
4. BACKFILL FOUNDATIONS WITH
5. REMOVE ALL ASSEMBLY AIDS BEFORE THE EQUIPMENT IS USED
THIS PRODUCT CONFORMS WITH BS EN1176- :2008
Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858
0.096
CUBIC M CONCRETE ALLOWING TO SET FOR 48 HOURS
1
& BS EN1176- 3:2008
http://www.fawns.co.uk mail:fawns@fawns.co.uk
No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2013
TECHNICAL DATA
MINIMUM SPACE REQUIRED
SUPERVISED PLAY
EQUIPMENT TYPE
LARGEST PART
HEAVIEST PART
10.98M X 8.67M
RECOMMENDED
HIGH LEVEL
4.9M X 0.125M DIA
36 KG (TIMBER 011)
Version: C
Date:
11/05/16
PAGE
1
OF
4

Advertisement

loading

Summary of Contents for FAWNS Playtime PICK UP STICKS 8

  • Page 1 Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858 http://www.fawns.co.uk mail:fawns@fawns.co.uk Version: C No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2013 Date: 11/05/16...
  • Page 2 2150 2213 250MM x 250MM x 700MM DEEP 2760.5 2664.9 3542.5 2500.0 2790.0 2150.0 3155.8 2746.0 2766.3 2430 2150 ALL FOUNDATIONS ARE 400 X 400 X 700 DEEP UNLESS OTHERWISE SPECIFIED NOTE: DO NOT CONCRETE POSTS UNTIL UNIT HAS BEEN ASSEMBLED PAGE...
  • Page 3 8665 3300 3389 1096 1507.9 1527.0 1565.8 2055.8 1359.7 1676.1 1449.6 1541.6 3971 1420 2108 66.0 SQ METRES WETPOUR SURFACING 30.5 LINEAR METRES WETPOUR EDGING PAGE...
  • Page 4 9000 2385.7 3444.1 1944.1 1416.0 1653.4 3289.9 2344.8 2168.0 57 GRASS SAVER TILES (1.0M X 1.5M) PAGE...
  • Page 5 Woodcot Court, 2A Woodcot Gardens, Farnborough, Hampshire GU14 9RD Tel: 01252 515199 Fax: 01252 515858 http://www.fawns.co.uk Email:fawns@fawns.co.uk No part of this document may be copied or used without the express written permission of FAWNS RECREATIONAL SERVICES LTD (c) FRS 2013 PAGE...
  • Page 6 POST ASSEMBLY & INSTALLATION Excavate the foundations as detailed using sheet PICUS8-SPEC. Posts labelled 003,004,005 &006 on this part of the unit should all be leaning at a 10 angle away from posts 001 & 002. All posts should all be pre-drilled and of the correct location to achieve this angle. Ensure all bolts and screws are loosely fitted to give enough movement for ropes and timbers to have the appropriate tensioning.
  • Page 7 Create stability to the two frames created on page 2 by adding the horizontal timbers pictured below. First, attach horizontal timber 014 to the two uprights 003 & 004 using the supplied Coach Bolts. (Timber 014 will have a hanging net attachment later on in this instruction so ensure the double counterbores are positioned in the correct places).
  • Page 8 2150.0 1600.0 2150.0 NOTE: Use dimensions to measure parallel to posts 011 & 012 PAGE...
  • Page 9 Prop post labelled 009 into the foundation hole. Using the dimensions below, secure posts 015 & 016 to posts 004 & 009 using the supplied Coach Bolts into the pre-drilled holes (post 009 does not have a pre-drilled hole to secure post 015 so this will need to be pre-drilled prior to securing with a Coach Bolt) Ensure post 009 has a scollop at the top of the post which will also point in the correct direction for the Trapeze Swing.
  • Page 10 Prop post labelled 008 into the foundation hole. Position trapeze swing post 010 on top of posts 008 & 009 and secure in place using the illustrated Coach Screws. There are two extra double counterbore holes on post 008. Ensure these holes are approximately guided towards post 005 as these will be used to fit a rope walk.
  • Page 11 Prop post labelled 007 into the foundation hole. Secure post 013 to posts 003 & 007 using the supplied Coach Bolt using the pre-drilled holes as illustrated below. Repeat the same procedure attaching post 018 to posts 007 & 006. As with the other posts pay particular attention to the position of the pre-drilled counterbore holes which will later be used to secure a rope structure.
  • Page 12 With posts 013 and 018 secured in place, position and secure posts 017 & 019 using the dimensions below. These require fixing with 1 x Coach Bolt and 1 x Coach Screw in each post. Both posts 011 & 018 have not been pre-drilled to accept a Coach Bolt so will require drilling on site. Line up post 017 to the underside of post 018 using the below dimensions and drill a hole through.
  • Page 13 With all posts now secured in place, secure the final post 020 onto posts 013, 017 & 019 using the supplied Coach Screws. As with any Coach Screw attachment ensure a 8mm pilot hole is drilled prior to prevent the timber from splitting. Finally the ropes can be added to the unit.