Download Print this page

FarmTek 106391 Installation Instructions page 2

400w metal halide large wallpack

Advertisement

INSTALLATION and MOUNTING:
turn power on until fixture is completely installed.
The Wallpack fixtures are designed to be mounted on any surface (suitable above the ground 4 feet). The
inside surface of the wallpack backplate has a cast in drill and knockout template to match any standard
recessed junction box, as well as knockouts for three 5/16" mounting holes "X". SIX 1/2" NPS tapped holes
"Y" are also available for surface conduit, photocontrol, etc.
X.
- are knockouts for 5/16" diameter mounting holes.
Y.
- are 1/2" NPS tapped holes.
1)
Remove the refractor by loosening the 2
captive screws on top of the fixture.
2)
Remove the reflector.
3)
Prepare the backplate for mounting by drilling
or knocking out the appropriate holes.
4)
Line up the backplate in desired location and
mount securely.
5)
Complete the wiring to the power source and
ground (see wiring instructions).
6)
Reassemble the reflector, install lamp into
socket and close refractor with two captive
screws.
7)
Install conduit plugs in all unused holes.
NOTE: To weatherproof your outdoor installation, be sure to seal all holes in fixture housing with silicone
sealant.
WIRING: Units built for a specific voltage are completely wired in factory. Double check your power source
to make sure the supply voltage is compatible with the unit.
Quad Tap (Q4) units may be used with a choice of 120V, 208V, 240V OR 277V provided that proper ballast
leads are connected in the field. For example, if your supply voltage is 120V, connect the "HOT" supply wire
to the 120V ballast tap and the "COMMON" supply wire to the ballast "COMMON" wire. Attach your ground
supply wire to the grounding post on fixture. Make sure all of the unused leads are properly capped.
Make sure that all power is turned off while installing this unit. Do not
Y
Y
X
Y
Y
Y
X
X
Y

Advertisement

loading