INSTALLATION OF INDOOR, OUTDOOR UNIT
10
Piping length and elevation
Distributor type Models
Capacity
Phase
(kBtu/h)
40
1 Ø
48
56
CAUTION
!
Capacity is based on standard length and maximum allowance length is on the basis of
reliability. If outdoor unit is at higher elevation than the indoor units, after 24 m of vertical
height, 1 oil trap is required.
Total
Max Main Pipe
Length
Length (A/B)
100
50
135
55
145
55
Distributor
A
Distributor
h1
Main Pipe
B
Distributor Type
Total Branch
Max Branch
Pipe Length
Pipe Length
50
15
80
15
90
15
Branch Pipe
h2
(Unit: m)
Max Elevation
In - In
(h1)
Elevation (h2)
30
15
30
15
30
15