DANGER: Check thoroughly, all operations in the installation, ensuring the
system is installed correctly. Pay special attention that DC and AC voltages
are in the specified ranges of iCAN NetZero Plus.
Items
PV connection
Battery connection
AC breaker
Grid connection
Generator connection
Wiring
Wiring box covers
Conduit
Wire protection
Notes
External breaker is installed.
The appropriate breaker is installed as specified.
The breaker is turned OFF.
Open-circuit voltage of PV arrays is within the
allowed range.
Positive and negative polarities are correct.
There is no voltage to the battery ports.
Positive, negative, and REF polarities are correct.
AC breaker is turned OFF.
External breaker is installed.
The appropriate breaker is installed as specified.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
External breaker is installed.
The appropriate breaker is installed as specified.
The breaker is turned OFF.
N, L2, L1 are wired correctly.
Voltage is within the allowed range.
All cables are wired tightly.
All wiring covers are screwed tightly.
All conduits are tightly installed and sealed.
Insulated cover of wires is not at risk of being cut or
damaged.