Working Positions; Unloading Instruction - Lindsay JUNIOR 1 User Manual

Table of Contents

Advertisement

2 – WORKING POSITIONS
Position "1" to:
- Hand moving and hook of the machine to the tractor.
Position "2" to:
- Prepare the machine the PE-hose pulling in or pulling out;
- Hook and/or unhook the sprinkler trolley.
- Adjust the PE-hose pulling out speed.
POS. 1
POS. 2
3 – UNLOADING INSTRUCTION
Unloading operations mean the action to make at the machine delivery or in cases when it is transported
by truck or by trailer.
3.1 The unloading must be done by appropriate cranes or tackles sized to the machine weight:
3.1.1 Put the appropriate lifting bands "A" around the drum axle as specified on the drawing below;
3.1.2 Lift 10 cm the machine from the truck/trailer floor and slowly put it onto the ground;
3.1.3 Take off lifting bands "A".
4

Advertisement

Table of Contents
loading

Table of Contents