Advertisement

Quick Links

JUNIOR 1
USER MANUAL
LINDSAY EUROPE
Tél. : 33 (0)2 43 48 02 02
72300 La Chapelle d'Aligné
Fax : 33 (0)2 43 48 02 00
FRANCE
www.lindsay-europe.com
1

Advertisement

Table of Contents
loading

Summary of Contents for Lindsay JUNIOR 1

  • Page 1 JUNIOR 1 USER MANUAL LINDSAY EUROPE Tél. : 33 (0)2 43 48 02 02 72300 La Chapelle d’Aligné Fax : 33 (0)2 43 48 02 00 FRANCE www.lindsay-europe.com...
  • Page 2: Table Of Contents

    INDEX INDEX ................................. 2 1 – ALLOWED USING CONDITIONS ........................3 2 – WORKING POSITIONS ..........................4 3 – UNLOADING INSTRUCTION .......................... 4 4 – TRANSPORTATION INSTRUCTIONS ......................5 5 – IRRIGATION INSTRUCTION : INSTALLATION ....................6 6 – IRRIGATION INSTRUCTION – STARTING AND UTILIZATION ................. 6 7 –...
  • Page 3: Allowed Using Conditions

    1 – ALLOWED USING CONDITIONS The machine has been designed and manufactured for the irrigation of any kind of agricultural area, sport grounds, parks, and greenhouses. In case of machine equipped with an engine for the hose rewinding, the utilization could be also for spreading slurry liquids.
  • Page 4: Working Positions

    2 – WORKING POSITIONS Position “1” to: - Hand moving and hook of the machine to the tractor. Position “2” to: - Prepare the machine the PE-hose pulling in or pulling out; - Hook and/or unhook the sprinkler trolley. - Adjust the PE-hose pulling out speed. POS.
  • Page 5: Transportation Instructions

    3.2 With forklift truck : place the forklift under the chassis bottom and paying attention to not swing it, lift carefully and lay the machine down onto the ground. 3.3 With tractor: 3.3.1 Move the truck/trailer close to a load platform with the same height or, if the truck/trailer has place the appropriate rails;...
  • Page 6: Irrigation Instruction : Installation

    5 – IRRIGATION INSTRUCTION : INSTALLATION 5.1 Tow the machine in an operating area, paying attention that the area is flat, if not make an appropriate area on the field; 5.2 Prepare the machine so that the pull out trolley is parallel to the same way that it will have to do; 5.3 Dig the staker legs “Z”as much as possible into the ground.
  • Page 7: Instruction For Speed Adjustment

    6.3 With a tractor start pulling-out PE-hose at a max speed of 2 Km/h and keeping a straight lane and a constant speed, run till the end of the field and lower speed when starting the last 25 meters; in case of field longer than PE-hose, save 1,5 - 2.0 PE-hose coils in the drum.
  • Page 8: 8- Wrong Use Of The Machine

    8- WRONG USE OF THE MACHINE 8.1 Do not pull out the PE hose parallel to ditches closer than 5 meters; 8.2 Put wooden rods under the laid PE-hose before rewinding it in muddy grounds ( every 10-15 meters ); 8.3 Never leave the handle in the PTO;...
  • Page 9: 9- Maintenance

    9- MAINTENANCE Maintenance means all the operations needed for a perfect running and for a long working life of the machine. All the operations must be done periodically : see drawing on the right and schedule. POS. DESCRIPTION Inlet gasket on drum greasing ( water inlet on drum ) Drum plummer blocks greasing Lead screw chain greasing...
  • Page 10: 10- Irrigation Data

    10- IRRIGATION DATA PE hose length Hose thickness Ø PE (mm) Water application mm (mm) Ø Endgun Flow Irrigated Inlet Mano Inlet Mano Inlet Mano Inlet Mano endgun Spacing Speed Speed Speed Speed pressure lenght rate area pressure pressure pressure pressure pressure pressure...

Table of Contents