Map FlexView FVS IFP Series Instruction Sheet page 14

Electric lift
Table of Contents

Advertisement

LEVER LOCK™ TOOL FREE INTERNAL MANAGEMENT SYSTEM
The FlexView comes equipped with the following Lever Lock™ items: (4) LL receptacle brackets,
(2) LL-HC21 horizontal channels, and (1) LL-VP1710 vertical 10" deep plate.
NOTE:
Not For
Component
Storage
Lever Lock Plate Installation / Configuration
1. Insert the Lever Lock plate into the
mating slots in the upper horizontal channel.
(FIGURE K)
2. Secure lock mechanism into the mating slots
in the lower horizontal channel. (FIGURE L)
NOTE: Position the flanges to the outside of
the rack to maximize usability.
Horizontal Channel Installation / Configuration
1. Insert horizontal channels into the mating slots in
the side receptacle brackets. Ensure the lock
mechanism is facing the bottom of the rack.
(FIGURE L)
2. Push horizontal channels into place until
locking mechanism clicks.
Locking Rivet Installation
1. Install plastic locking rivet into the inner
holes as shown to prevent locking
mechanism from disengaging. (FIGURE M)
Use Receptacle Brackets
To Lace Cable Bundles
From Top To Bottom
2-Space Rail
Lock Mechanism
Page 14
Plate To Mount
FIGURE K
FIGURE L
Use Vertical
Small Devices
Use Horizontal
Channels To
Manage Cables
Locking Rivet
FIGURE M