Assembly  Instructions  /  Liner  Layout - Quik Swim Pool QS 142248 Owner's Manual

Table of Contents

Advertisement

Pool assembly / Liner layout
8
Step 5:
Assembling the long sides first: Starting from the side at your Right, insert into the rectangular big
opening corner of the pool, the "A" top rail with the female end looking ahead. (Make sure to start from
the right lateral side. This will allow the corners to fit correctly). Insert the rest of the pipes one at a time,
in order to the diagram on the previous page and make sure they are locked correctly. You will hear a
"click"  when  they  are  properly  positioned.  Make  sure  all  holes  in  the  pipes  coincide  with  the  openings  on  
the sleeve of the liner. Repeat this operation with the opposite long lateral.
Female looking
ahead
Female looking
ahead
Step 6:
Assembling the short sides: Take a long lateral top rail and extend it outwards, (2 people do it better).
Repeat with the opposite long lateral top rail. As you did in step 5, insert the top rails into the sleeve,
starting from the right and with the female end looking ahead. Insert one pipe at a time in order to the
diagram   on   the   previous   page   making   sure   you   hear   "click".   Repeat   this   operation   with   the   opposite  
short lateral.
Step 7:
To finish with the assembly of the top rail, insert the corner pipe with the female end into the male
end of the top rail.
IMPORTANT TIP: Make sure to finish top rail assembly by inserting the last corner piece , male end
last. This step is very important as the corner piece is designed with an off set. Failure to follow the in-
structions may result in tearing of the material. Do not force corner piece, material will not stretch!
Make sure to finish with the male end last!
Insert here

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qs 142548

Table of Contents