Download Print this page

Sealey BSL100.V2 Instructions page 2

Cv joint boot tools

Advertisement

3.
CONTENT & ASSEMBLY
3.1
Unpack the boot tool and check that the contents are correct and undamaged. In case of a problem please contact your Sealey dealer.
Contents: a) Regulator
b) Boot tool base unit.
c) Eight steel stretching arms.
Assembly instructions (Figs.1-8):
3.2
Support the boot tool base in a vertical position as indicated in Fig.1.
3.3
Position the 8 guides in the grooves in the boot tool base with the guide groove facing outwards (Fig.2).
3.4
Insert an arm into one of the guides (Fig.3), with the hole in the arm facing downwards and the camber of the arm facing inwards.
3.5
Insert a pin into the hole in the wall of the boot tool below the arm (Fig.4) until the end of the pin can be seen on the
other side of the hole.
3.6
Repeat the process until all the arms are in position and
secured with pins as shown in Fig.5.
3.7
Place the protective rubber boot over the assembled arms
as shown in Fig.6. Push the rubber boot down over the
pin area and insert the bottom rim of the boot into the
peripheral groove on the base of the boot tool.
3.8
Screw the regulator into the boot tool handle (Fig.7).
3.9
When the tool is properly assembled it should appear as in
Fig.8. Double check, before use, that the arms are
correctlly fixed to the boot tool base and that the regulator
is firmly screwed into the handle.
4. AIR SUPPLY
WARNING! Ensure the air supply does not exceed 125psi while operating the unit. Too high an air pressure will shorten the life of the
#
unit and may cause damage and/or personal injury.
4.1
The boot tool has a female 1/4" BSP thread in the end of the handle. Obtain
and fit a suitable air connection fitting that can easily be disconnected from the
tool such as a male threaded adaptor (Sealey part No.AC04).
4.2
Where possible the compressor should be sited in a separate room with the
connecting airline kept as short as possible. The compressor should have an air
filter and water separator (Fig.9).
4.3
Drain the compressor air tank daily as water in the air line will damage the unit.
4.4
The recommended hook-up procedure is shown in Fig.9.
4.5
The minimum hose diameter should be 1/4" I.D. and fittings must have the
same inside dimensions.
4.6
Keep hoses away from heat, oil and sharp edges. Check hoses for wear and ensure that all connections are secure.
4.7
Line pressure should be increased to compensate for unusually long air hoses (over 8 metres).
d) Eight arm guides.
e) Eight pins for securing the arms.
f ) One protective rubber boot.
Fig.9
BSL100.V2, BSL101 - 3 - 170807

Advertisement

loading

This manual is also suitable for:

Bsl101