Installing and Replacing Additional Batteries

19. INSTALLING AND REPLACING ADDITIONAL
BATTERIES
Decommissioning at End of Life (EOL)
Battery SOH is reported in the Panasonic View, Panasonic's monitoring
software. When the SOH is below the level listed in Detail Battery Module
Specification the batteries are at EOL and should be replaced. Contact
Panasonic at panasonicbatterystorage@us.panasonic.com for details on
a replacement battery.
WARNING: Risk of electrocution! Do not disconnect any
battery leads while the system is energized.
WARNING: Risk of electric shock. Risk of fire. Do not attempt
to repair the battery(ies); it contains no user-serviceable
parts. Tampering with or opening the battery(ies) will
void the warranty. If the battery(ies) fails, Panasonic at
panasonicbatterystorage@us.panasonic.com
Adding and Replacing the Batteries
WARNING: Battery voltage heads to be within +/- 1V.
Prior to uninstalling a battery(ies), Customer Service must ensure that
the state of charge (SoC) matches the SoC as given in Replacement
Battery Information sheet in the box with the Replacement Battery(ies).
This is accomplished by charging or discharging the battery until SoC on
Dashboard matches the SoC on the Replacement Battery Information
sheet.
The battery will continue to operate until it reaches the desired SoC.
Since the rate at which the battery can charge or discharge is governed
by the loads, it can take several hours for the desired SoC to be reached
and for the Battery to be ready for replacement. Customer service will set
the system to the backup power program at the desired SoC 24-48 hours
in advance of the physical removal of the Battery. This is to ensure that
sufficient time has passed to allow the Battery(ies) to be at the correct
SoC when customer service personnel arrives to replace the battery(ies).
Once the Battery(ies) SoC is confirmed to be at the same SoC as the
Replacement Battery(ies).
Verify that all power is removed from the system before attempting
to remove the Battery(ies) by Initiate Rapid Shutdown and allow the
DC voltage to drop to a safe level power down Inverter and disconnect
wiring sources of AC and DC power.
Installation Manual
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evervolt standard evac-105-4Evervolt plus evac-105-6

Table of Contents