Assembly Instructions - Vanity Unit - 2 Doors
Please ensure a copy of the installation
instructions is left with the end user for future reference
Published 19/12/2019
Base Vanity Unit
Installation Instructions
Installation Instructions
1. Set up water inlet point and waste
for vanity top.
2. Place vanity into position and
ensure it is level (make minor
adjustment if required).
3. Drill pilot holes in the back of the
unit and fix unit to the wall using
suitable screws. Ensure that the
screws are fixed securely into a
solid wall or timber noggin. Minor
adjustments may need to be
made to align drawer runners and
hinges.
4. All final door and drawer
adjustments are the responsibility
of the installer at the time of
installation.
5. External edges where the
unit meets the floor and wall
should be sealed using flexible
waterproof sealants.
CLEANING RECOMMENDATIONS
We recommend the use of soapy water or
approved cleaners for the Vanity Top.
Cabinets are moisture resistant. Cabinet
surfaces should be cleaned with a damp
cloth and dried.
This product should not be cleaned with
abrasive materials.
Damage caused by any improper treatment
is not covered by the product warranty - refer
to Warranty Conditions
Need help?
Do you have a question about the Base and is the answer not in the manual?
Questions and answers