Page 1
PV-ezRack Cover for Isolator Bracket II Code-Compliant Planning and Installation Guide V1.0 Complying with AS/NZS 5033: 2014 AMDT 2: 2018...
Page 2
Introduction • Ensuring safe installation of all electrical Tools &Component list aspects of the PV array. This includes adequate ® earth bonding of the PV array and PV-ezRack Installation Instruction components as required in AS/NZS 5033-2014 AMDT 2 2-2018. page...
Page 3
(maximum torque ≥20 N·m , for M6 and M8 Hexagon Socket Screw) 2.2 Components CO-IBII/240/100 Cover for Isolator Bracket II page of 05 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
Page 4
3.3 Align the hole of L profile connecting piece with the elongated hole of the Isolator Bracket as shown in Figure 4. Figure 4 page of 05 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
Page 5
Note: The bolt heads should be inside of isolator bracket to minimize the interference of bolts on isolator. page of 05 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
Page 6
Note: Allow space above the Rail to open the isolator cover. Recommended torque for M8 bolts (with z modules) is 5-6N·m Figure 11 page of 05 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...