Section A - Mounting the Wall Cage - 10 Bay.

Tools required:
17mm spanner or socket (for shear nuts)
13mm socket for brass nut on Dynabolts
10mm masonry drill bit
Pencil
Hammer
Hammer drill
Level
WARNING: THIS WALL CAGE IS DESIGNED FOR INSTALLATION ON A SOLID CONCRETE WALL USING 4 X M8
DYNABOLTS. FOR OTHER TYPES OF WALL CONSTRUCTION YOU SHOULD SEEK VERIFICATION ON SITE BY A
QUALIFIED STRUCTURAL ENGINEER AS TO THE WALL'S SUITABILITY AND STRENGTH.
STEP 1.
Decide the position to install the Wall Cage taking into account the following:
Ensure power leads will reach to a nearby power point outlet. In the event that you need to use
extension cords (not supplied) from the Wall Cage to the power point, we suggest you use two, one
from each power board in the Wall Cage into a double power point.
Ensure no cables or pipes are located in the wall where the mounting holes will be drilled.
STEP 2.
Hold one of your devices against the wall at a
comfortable height. We suggest around 1.0m to
1.1m above the floor. Mark the underside of the
laptop on the wall.
STEP 3.
Measure 460mm above the devices base mark
and mark the wall again. This will be the line of
the top two Dynabolts. Now mark a 430mm long
horizontal line on the wall using a spirit level, or
measure the distance from the floor to the top
mark and make another mark that same distance
from the floor along the wall and draw the
430mm line along those two marks.
INSTRUCTION MANUAL
Tools required:
4x 75mm Dynabolts
4x shear nuts
4x washers